Project Name
Cooper Mountain Reservoir No. 2 and Associated Improvements

Bid/Contract #
CIP 4058A/ Solicitation #3624-20B

Awarding Agency
City of Beaverton

Project Location
Beaverton , Washington County, OR

Bid Date
02/25/2020 at 14:00

Project Details
The Work includes, but is not limited to:
1. Construction of a partially buried 5.5 million gallon (MG) prestressed concrete reservoir meeting AWWA D110 standards;
2. Construction of fully buried, cast-in-place concrete valve vault structure and associated electrical/controls building of concrete masonry unit and wood-framed roof construction;
3. Selection and installation of temporary construction shoring systems as required;
4. Construction of a CMU-style drinking water booster pump station (pumps and select electrical gear not installed under this contract);
5. Construction of an CMU-style ASR mechanical building to include chemical treatment systems;
6. Construction of ASR wellhead improvements to include furnishing and installing a vertical turbine well pump, pump base and well head enclosure;
7. Construction of an approximately 4,800 SF metal framed storage building designed by the building system supplier;
8. Furnish and install site stormwater detention and treatment facilities;
9. Site clearing, including tree removal, grading and earthwork at City's reservoir site;
10. Excavation for and backfilling of above components as required for a complete installation;
11. Furnish and install approximately 3,200 LF of restrained ductile iron water main,
12-, 18- , 20 - and 24-inch diameter sizes as specified, including valves and appurtenances, both on-site and off-site in SW Kemmer Road;
12. Connection of the new water mains to existing main lines, including transmission
and reservoir site connections;
13. Coordination for site access of other projects occurring on the project site, as needed;
14. Site access roads, paved and gravel;
15. Landscaping and screening;
16. Site chain-link fencing and automated vehicle access gate;
17. Improvements to existing prestressed concrete reservoir to include a hydraulic mixing system and flexible piping connection improvements;
18. Installation of electrical improvements to allow continued use of existing facilities;
19. New electrical service and electrical improvements;
20. System integration by City's system integrator;
21. Sanitary system improvements to include a septic field;
22. Abandonment of existing water main and storm drains; and
23. Restoration of work site area to original or better condition, including grading, temporary and permanent paving, erosion control, and other measures as required. 6. Construction of ASR wellhead improvements to include furnishing and installing a vertical turbine well pump, pump base and well head enclosure;
7. Construction of an approximately 4,800 SF metal framed storage building designed by the building system supplier;
8. Furnish and install site stormwater detention and treatment facilities;
9. Site clearing, including tree removal, grading and earthwork at City's reservoir site;
10. Excavation for and backfilling of above components as required for a complete installation;
11. Furnish and install approximately 3,200 LF of restrained ductile iron water main,
12-, 18- , 20 - and 24-inch diameter sizes as specified, including valves and appurtenances, both on-site and off-site in SW Kemmer Road;
12. Connection of the new water mains to existing main lines, including transmission
and reservoir site connections;
13. Coordination for site access of other projects occurring on the project site, as needed;
14. Site access roads, paved and gravel;
15. Landscaping and screening;
16. Site chain-link fencing and automated vehicle access gate;
17. Improvements to existing prestressed concrete reservoir to include a hydraulic mixing system and flexible piping connection improvements;
18. Installation of electrical improvements to allow continued use of existing facilities;
19. New electrical service and electrical improvements;
20. System integration by City's system integrator;
21. Sanitary system improvements to include a septic field;
22. Abandonment of existing water main and storm drains; and
23. Restoration of work site area to original or better condition, including grading, temporary and permanent paving, erosion control, and other measures as required.

Subcontractor and supplier opportunities are available but not limited to the following categories of work: asphalt paving subcontractor; concrete cutting subcontractor; concrete pumping subcontractor; concrete work subcontractor; electrical subcontractor; excavating subcontractor; fencing subcontractor; fencing subcontractor; grading subcontractor; trucking (dump trucks) subcontractor; HVAC subcontractor; landscaping subcontractor; masonry subcontractor; metal works subcontractor; coating/painting subcontractor; plumbing subcontractor; roofing subcontractor; sewer, water & storm drain subcontractor; traffic control subcontractor; utilities subcontractor; dewatering subcontractor; segmented retaining wall subcontractor; aquifier testing subcontractor; well drilling subcontractor.

Participation Goals: 10% COBID-Certified Subcontractors

James W. Fowler Co. is an equal opportunity employer and we are requesting qualified subcontractor and supplier bids from all interested firms, including disadvantaged, minority, women, and other business enterprises. Where economically feasible, we are willing to divide total contract requirements into smaller portions or quantities to permit maximum participation by D/M/W/ESB firms. Please contact us to discuss opportunities available.

James W. Fowler Co. will assist D/M/W/ESB subcontractors in obtaining necessary equipment, supplies, or materials. We are also available to provide assistance in obtaining bonding, lines of credit and/or insurance to D/M/W/ESB subcontractors. Please complete all negotiations 24-hours prior to bid opening. We also encourage the utilization of apprentices for this project.

Bid documents can be obtained from the City of Beaverton or from James W. Fowler Co. by clicking on the link below. The plans and specs are available at no cost on the James W. Fowler Co. website at www.jwfowler.com. For more information, please contact James W. Fowler Co. at (503) 623-5373. Quotes may be faxed to (503) 623-9117 or emailed to estimating@jwfowler.com.

Please follow the below link for plans, specifications and addenda issued for this project.

http://www.jwfowler.com/bidopportunities/

How to get in touch


Outreach Coordinator
Sonja Sommerfeldt

Project Estimator
Dick McElligott

Telephone
(503) 623-5373

Fax
(503) 623-9117

Address
12775 Westview Drive
Dallas, OR 97338