Is seeking qualified MBEs, WBEs, SBEs, District Local Small Businesses
Outreach Coordinator
Jamie Miranda
Project Estimator
Aron Oshio
Telephone
(707) 759-6858
Fax
(510) 777-5099
Address
1 Harbor Center, Suite 200, Suite 200
Suisun City, CA 94585
Project Name
34.5kV Cable Replacement and Fiber Optic Cable Installation, R-Line, RCP to RRY
Bid/Contract #
15EJ-182
Awarding Agency
San Francisco Bay Area Rapid Transit District
Project Location
El Cerrito and Richmond, Contra Costa County, CA
Bid Date
05/05/2020 at 14:00
Project Details
We are seeking quotes from certified LSB and M/WBE subcontractor and supplier quotes on Clear & Grub, Contaminated Soil, Demolition, Earthwork, Electrical, Environmental, Erosion Control, Fence, Flatwork, Grinding AC Concrete, Instrumentation, Landscape, Masonry, Paving, General Piles, Precast Structural, Rebar, Shoring, Signs, Stray Current, Stripes & Markers, Survey, Aggregate Supply, Fabric Supply, Lumber Supply, Misc. Metals Supply, Sheet Pile Supply, Precast Utility Supply, Ready Mix Supply, Steel Fabrication Supply, Trench Shoring Supply, Plastic Utility Pipe Supply, Steel Utility Pipe Supply.
Goals: 10% Local Small Business
Availability Percentages: MBE 6%, WBE 3.9%
Contract Documents are available free of charge from the owner after registering on the BART portal located at suppliers.bart.gov. You may view the documents during business hours at our office located at 1 Harbor Center, Suite 200, Suisun City, CA 94585. We can also provide you with a link to download plans and specifications. To make an appointment for viewing or to receive the download link, please contact Jamie Miranda at jmiranda@shimmick.com. If you have any technical questions or require assistance obtaining necessary equipment, supplies, materials, or related assistance or services may contact our estimator Aron Oshio at aoshio@shimmick.com. 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. Shimmick Construction's listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor's conditions or exceptions included with the Subcontractor's price quote. Shimmick Construction requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact
Scott Fairgrieve at (510) 777-5000.
How to get in touch
Outreach Coordinator
Jamie Miranda
Project Estimator
Aron Oshio
Telephone
(707) 759-6858
Fax
(510) 777-5099
Address
1 Harbor Center, Suite 200, Suite 200
Suisun City, CA 94585
Plans, specs, and other bid documents