DBEGoodFaith.com


Mercer-Fraser Company

Is seeking qualified DBEs



Outreach Coordinator
Cassie Coppini

Project Estimator
Justin Zabel

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502


Project Name
Install Rock Fall Drapery

Bid/Contract #
02-0H69U4

Awarding Agency
Caltrans

Project Location
Burnt Ranch, Trinity County, CA

Bid Date
12/17/2019 at 02:00

Project Details
LEAD COMPLIANCE PLAN
DEVELOP WATER SUPPLY
CONSTRUCTION AREA SIGNS
TRAFFIC CONTROL SYSTEM
FLASHING BEACON
PORTABLE CHANGEABLE MESSAGE SIGN
TEMP RAILING
PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM
ALTERNATIVE TEMPORARY CRASH CUSHION
PREPARE WPCP
TEMP DRAINAGE INLET PROTECTION
TEMP CONCRETE WASHOUT
TREATED WOOD WASTE
CLEARING & GRUBBING
ROCK EXCAVATION
SHOULDER BACKING
DITCH EXCAVATION
FINISHING ROADWAY
HOT MIX ASPHALT
COLD PLANE ASPHALT CONCRETE PAVEMENT
STRUCTURAL CONCRETE, DRAINAGE INLET
CORRUGATED STEEL PIPE
REMOVE CULVERT
REMOVE INLET
CABLE NET ELEVATED DRAPERY
DOUBLE TWISTED WIRE MESH ELEVATED DRAPERY
CABLE NET ATTENUATOR
DOUBLE TWISTED WIRE MESH ATTENUATOR
CABLE NET DRAPERY
MINOR CONCRETE
MISC IRON AND STEEL
STAIN GALVANIZED SURFACES
REMOVE PAVEMENT MARKER
PAVEMENT MARKER (RETROREFLECTIVE-RECESSED)
MARKER (CULVERT)
REMOVE MARKER
MIDWEST GUARDRAIL SYSTEM
END ANCHOR ASSEMBLY
ALTERNATIVE IN-LINE TERMINAL SYSTEM
REMOVE GUARDRAIL
THERMOPLASTIC TRAFFIC STRIPE
INVASIVE SPECIES CONTROL

Mercer-Fraser Company is an Equal Opportunity Employer. Mercer-Fraser Company is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided for obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

How to get in touch


Outreach Coordinator
Cassie Coppini

Project Estimator
Justin Zabel

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502