DBEGoodFaith.com


Mercer-Fraser Company

Is seeking qualified DBEs



Outreach Coordinator
Cassie Coppini

Project Estimator
Kody King

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502


Project Name
Roadway Excavation, Place HMA & Agg Base

Bid/Contract #
01-0F2204

Awarding Agency
Caltrans

Project Location
Eureka, Humboldt County, CA

Bid Date
12/17/2019 at 02:00

Project Details
LEAD COMPLIANCE PLAN
PROGRESS SCHEDULE (CRITICAL PATH METHOD)
CONSTRUCTION AREA SIGNS
TRAFFIC CONTROL SYSTEM
TYPE III BARRICADE
TEMPORARY TRAFFIC STRIPE
CHANNELIZER (SURFACE MOUNTED)
PORTABLE CHANGEABLE MESSAGE SIGN
TEMP RAILING
ALTERNATIVE TEMP CRASH CUSHION
PREPARE SWPPP
RAIN EVENT ACTION PLAN
STORM WATER SAMPLING AND ANALYSIS DAY
STORM WATER ANNUAL REPORT
TEMP FIBER ROLL
STREET SWEEPING
TEMP CONCRETE WASHOUT
TREATED WOOD WASTE
CONTRACTOR-SUPPLIED BIOLOGIST
TEMP HIGH-VISIBILITY FENCE
CLEARING AND GRUBBING
ROADWAY EXCAVATION
SHOULDER BACKING
IMPORTED BORROW
ROADSIDE CLEARING
INVASIVE SPECIES REMOVAL
SOIL AMENDMENT
FERTILIZERS
PLANTS
PLANT ESTABLISHMENT WORK
WOOD MULCH
TEMP IRRIGATION
MOVE-IN/MOVE-OUT (EROSION CONTROL)
FIBER REINFORCED MATRIX
CLASS 2 AGGREGATE BASE
HOT MIX ASPHALT
HOT MIX ASPHALT - OPEN GRADED COLORIZED FRICTION COURSE
GEOSYNTHETIC PAVEMENT INTERLAYER
PLACE HOT MIX ASPHALT (MISC AREA)
TACK COAT
COLD PLANE AC PAVEMENT
DELINEATOR
PAVEMENT MARKER
REMOVE ROADSIDE SIGN
RELOCATE ROADSIDE SIGN
MIDWEST GUARDRAIL SYSTEM
VEGETATION CONTROL (MINOR CONCRETE)
END ANCHOR ASSEMBLY
ALTERNATIVE IN-LINE TERMINAL SYSTEM
REMOVE GUARDRAIL
RECONSTRUCT GUARDRAIL
THERMOPLASTIC PAVEMENT MARKING
THERMOPLASTIC TRAFFIC STRIPE
REMOVE THERMOPLASTIC TRAFFIC STRIPE
REMOVE THERMOPLASTIC PAVEMENT MARKING
RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT)
MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION
MODIFYING EXISTING ELECTRICAL SYSTEM

Mercer-Fraser Company is an Equal Opportunity Employer. Mercer-Fraser Company is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided for obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

How to get in touch


Outreach Coordinator
Cassie Coppini

Project Estimator
Kody King

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502