DBEGoodFaith.com


Mercer-Fraser Company

Is seeking qualified DBEs



Outreach Coordinator
Cassie Coppini

Project Estimator
Kody King

Telephone
(707) 443-6371 Ext. 7074436371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502


Project Name
Roadway Excavation, Place HMA & High Tension Cable Barrier

Bid/Contract #
01-0C9704

Awarding Agency
Caltrans

Project Location
Eureka & Arcata, Humboldt County, CA

Bid Date
12/16/2019 at 02:00

Project Details
LEAD COMPLIANCE PLAN
PROGRESS SCHEDULE (CRITICAL PATH METHOD)
DEVELOP WATER SUPPLY
CONSTRUCTION AREA SIGNS
TRAFFIC CONTROL SYSTEM
PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY RAILING
ALTERNATIVE TEMPORARY CRASH CUSHION
JOB SITE MANAGEMENT
PREPARE STORM WATER POLLUTION PREVENTION PLAN
RAIN EVENT ACTION PLAN
STORM WATER SAMPLING AND ANALYSIS DAY
STORM WATER ANNUAL REPORT
MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
TEMPORARY HYDRAULIC MULCH
TEMPORARY CHECK DAM
TEMPORARY DRAINAGE INLET PROTECTION
TEMPORARY FIBER ROLL
TEMPORARY CONCRETE WASHOUT
TREATED WOOD WASTE
INVASIVE SPECIES CONTROL
TEMPORARY HIGH-VISIBILITY FENCE
CLEARING AND GRUBBING
ROADWAY EXCAVATION
ROADWAY EXCAVATION
WOOD MULCH
HYDROMULCH
HYDROSEED
COMPOST
INCORPORATE MATERIALS
CLASS 2 AGGREGATE BASE
HOT MIX ASPHALT
HOT MIX ASPHALT-OPEN GRADED
GEOSYNTHETIC PAVEMENT INTERLAYER
TACK COAT
COLD PLANE ASPHALT CONCRETE PAVEMENT
ADJUST INLET
PAVEMENT MARKER
OBJECT MARKER
RESET ROADSIDE SIGN
MIDWEST GUARDRAIL SYSTEM
METAL BEAM GUARD RAILING
VEGETATION CONTROL
DOUBLE MIDWEST GUARDRAIL SYSTEM
HIGH TENSION CABLE BARRIER
TRANSITION RAILING (TYPE WB-31)
RAIL TENSIONING ASSEMBLY
ALTERNATIVE CRASH CUSHION
END ANCHOR ASSEMBLY
ALTERNATIVE IN-LINE TERMINAL SYSTEM
CONCRETE BARRIER TRANSITION
REMOVE GUARDRAIL
REMOVE METAL BEAM BARRIERS
6" THERMOPLASTIC TRAFFIC STRIPE
MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION
CHANNELIZER (SURFACE MOUNTED)
PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS

Mercer-Fraser Company is an Equal Opportunity Employer. Mercer-Fraser Company is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided for obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

How to get in touch


Outreach Coordinator
Cassie Coppini

Project Estimator
Kody King

Telephone
(707) 443-6371 Ext. 7074436371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502