Is seeking qualified DBEs
Outreach Coordinator
Mina Jeung
Project Estimator
Jim Prior
Telephone
(510) 748-1870
Fax
(510) 748-1205
Address
2800 Harbor Bay Parkway
Alameda, CA 94502
Project Name
SMART: Non-Motorized Pathway, Payran St to Southpoint Blvd
Bid/Contract #
CV-BB-18-001
Awarding Agency
Sonoma-Marin Rail Area Transit
Project Location
Petaluma, Sonoma County, CA
Bid Date
04/12/2019 at 05:00
Project Details
SWI is requesting quotes for the following:
AC Paving, CIDH Piling, Clearing/Demo/Tree Removal, Hydroseeding, Fencing, Flatwork, Pre-Engineered Bridge, Striping, Signage, Trucking & Hauling, SWPPP Plan, Survey, Aggregates, Ready Mix Concrete, Retaining Wall (Masonry Blocks), Erosion Control Material
If interested, please email us at swicalest@stacywitbeck.com or call at (510) 748-1870.
SWI is an Affirmative Action/EEO company and is willing to assist qualified, certified DBE firms to achieve our subcontractor/supplier goals. Please also provide bond rates with your submitted bids. In some cases, we may be able to provide technical, bonding, and insurance assistance to subcontractors who may otherwise be at a disadvantage. DBE Goal is 6.06%.
This is a Buy America project. Prevailing wage rates apply.
Plans and specs available for download at:
https://stacywitbeck.box.com/v/payransouthpoint
How to get in touch
Outreach Coordinator
Mina Jeung
Project Estimator
Jim Prior
Telephone
(510) 748-1870
Fax
(510) 748-1205
Address
2800 Harbor Bay Parkway
Alameda, CA 94502