DBEGoodFaith.com


NTK Construction, Inc.

Is seeking qualified DBE



Outreach Coordinator
Nancy Felden

Project Estimator
Tin Tran

Telephone
(415) 643-1900

Fax
(415) 643-1300

Address
501 Cear Chavez Street 123
San Francisco, CA 94501


Project Name
Union City Intermodal Station Phase II - BART Station Improvements

Bid/Contract #
Contract No. 01VM-110

Awarding Agency
San Francisco Bay Area Rapid Transit - BART

Project Location
Union City, California County, CA

Bid Date
05/29/2012 at 02:00

Project Details
Union City Intermodal Phase II consists of the construction of a 2000 sf. Concourse addition on the east side of the Union City Station and a re-configuration of the existing station concourse, including finish surface upgrades, to provide a fee passage through the station for future connection to 11th Street. Connecting to the east to 11th Street is not part of the project. All improvements being made are on BART property, however BART has obtained a Right of Entry Agreement with Union Pacific Railroad for 15 foot wide access on railroad property to access the east side of the station for construction of the improvements. The reconfiguration will require construction of a new Station Agent Booth and two new platform elevators to replace the existing booth and elevators that will be demolished to enable the free passage. The patron restrooms will be reconstructed and the Station Agent break room and locker room will be constructed on the west side of the station. New fare collection equipment and fare gates will be furnished and installed in the expanded concourse area. Two new end of platform emergency exit stairs will be constructed at each end of the east side platform with safe dispersal areas. The construction includes the abatement of existing hazardous materials. The estimated cost for this work is $10,000,000

Available scopes of work: Asbestos Abatement, Lead-Based Paint Abatement, Masonry, Metals, Waterproofing, Gypsum Board, Plaster, Tiling, Painting, Fire Suppression, HVAC and Electrical The plans and specs are available for your review at our office or may be purchased from BART at 300 Lakeside Dr., 23rd Flr., Oakland, CA 94612. We are an equal opportunity employer.

How to get in touch


Outreach Coordinator
Nancy Felden

Project Estimator
Tin Tran

Telephone
(415) 643-1900

Fax
(415) 643-1300

Address
501 Cear Chavez Street 123
San Francisco, CA 94501