Is seeking qualified DBEs
Outreach Coordinator
Nicholas Jones
Project Estimator
Dan Shults
Telephone
(607) 433-2100
Fax
(000) 000-0000
Address
Route 7 PO Box 219
Colliersville , NY 13747
Project Name
WI-284, Reconstruction of Primary Tanks at Wards Island WRRF
Bid/Contract #
WI-284
Awarding Agency
New York State Department of Environmental Protection
Project Location
New York , New York County, NY
Bid Date
02/02/2022 at 02:00
Project Details
If you have any questions please reach out to below or call (607) 433-2100
Daniel Shults - Estimate Lead - Dan.Shults@kiewit.com
Hanna Majestic - Division 1 & Abatement Subs - hanna.majestic@kiewit.com
Luke Spencer - AG Pipe & Misc Metals - luke.spencer@kiewit.com
Kimberly Miller - Process Equipment - kim.miller@kiewit.com
Everett Thompson - Concrete Demolition & New, Crack & Spall Repairs. - everett.thompson@kiewit.com
David Hollander - Civil / Sitework - david.hollander@kiewit.com
Vasily Podkopaev - HVAC & Plumbing vasily.podkopaev@kiewit.com
Project has a 20% DBE Goal
The following is a general description of Work under this Contract only, and shall not be construed as a complete description of the work to be performed.
Reconstruction of Primary Settling Tank (PST) Nos. 2201 through 2210, including, but not necessarily limited to, the following:
Removal and disposal of hazardous material.
Draining, removal of debris, and cleaning of each PST, including associated scum pits.
Rehabilitation of existing structural concrete deficiencies including the repair of cracks, spalls, and expansion joints in the PSTs and the corresponding scum pits.
Demolition and removal of the existing longitudinal and cross sludge collector mechanisms, including, but not limited to, flights, wearing shoes, flight chains, drive chains, drive units with motors, gear reducers, bevel gears, sprockets, shafts, wall bearings, collars, floor rails, upper and lower return rails, upper and lower return rail support systems, anchor bolts, local control stations and other appurtenances.
Demolition and removal of the existing tank drain slide gates, wall thimbles, floor stand operators, anchor bolts, and appurtenances.
Demolition and removal of the existing primary tank influent gates, frames, floor stand operators, anchor bolts, and appurtenances.
Demolition and removal of the existing target baffles.
Demolition and removal of the existing effluent weir plates.
Provision of new longitudinal and cross sludge collector mechanisms for each PST, including, but not limited to, flights, wearing shoes, flight chains, drive chains, drive units with motors, gear reducers, bevel gears, sprockets, shafts, wall bearings, collars, floor rails, upper and lower floor rails, upper and lower return rail support systems, anchor bolts, local control stations and other appurtenances.
Provision of new tank drain slide gates and floor stand operators.
Provision of new primary tank influent gates, frames, floor stand operators, anchor bolts, and appurtenances.
Provision of new target baffles.
Provision of new effluent weir plates.
Demolition and removal of the existing scum dipping troughs, wall thimbles, embedded pipe, anchor bolts, manual operators, and appurtenances.
Provision of new, automated, chain-driven scum dipping troughs with modulating electric actuators, gear reducers, and local control stations for each PST, including, but not limited to new power and control wire, conduit, wall thimbles, anchor bolts, embedded pipe, and accessories.
Demolition and removal of the existing exterior light fixtures and poles.
Demolition and removal of existing walkway slabs and curbs at locations of new light poles.
Provision of new exterior light fixtures and poles at new walkway slabs.
Removal of concrete slabs-on-ground between Pre-Houses and scum pits.
Provision of new concrete slabs between Pre-Houses and scum pits.
Demolition and removal of the existing scum decant piping, fittings, valves, gates, wall thimbles, anchorages, anchor bolts, and appurtenances.
Provision of new scum drain gates, wall thimbles, telescoping weir and telescoping weir base support elbow, anchorages, floor stand operators, and anchor bolts.
Demolition of the 8-in. diameter drain from each scum pit to the 20-in. drain in the pipe gallery, including (but not limited to): excavation, bracing, dewatering, and backfilling
Separate temporary pumping of the 20-in. Plant Drain at each Pre-House.
Provision of a new 10-in. drain from each scum pit to the existing 20-in plant drain under the floor slab in the gallery.
Demolition, Repair, and Provision of new stainless steel handrails.
Demolition and removal of the existing hydraulic bucket cranes for each scum pit.
Provision of new hydraulic bucket cranes for each scum pit.
Provision of new hydraulic bucket cranes for each scum pit
Upgrade Preliminary Sludge Pumping Station/Pre-House Nos. 1 through 5
General Demolition, removal, and replacement of Electrical Equipment / conduit, HVAC equipment, and Plumbing equipment.
General Demolition, removal, and replacement of Roofing, Masonry, Precast Planks, concrete floors and walls, Architectural work.
Provision of an air lock vestibule at the North end of the Pipe Gallery.
Removal and replacement of compressed air system
Provision of a new package service water system.
Demolition & replacement of the existing fifteen (15) Primary Sludge Pumps.
Site Restoration, Including:
Civil work
Demolition and restoration of the existing Plant roads, curbs, and sidewalks in the vicinity of the PST
Installation of new yard hydrants at each Pre-House and scum pit
How to get in touch
Outreach Coordinator
Nicholas Jones
Project Estimator
Dan Shults
Telephone
(607) 433-2100
Fax
(000) 000-0000
Address
Route 7 PO Box 219
Colliersville , NY 13747