The Work includes, but not limited to, the following major items:
a. Aeration blower replacement and blower room modifications.
b. Temporary blower system.
c. Relocation of roof drain pipes in blower room.
d. Upgrades to aeration piping and fine bubble diffuser system.
e. Modifications and upgrades to aeration tanks including baffle and mixer
additions.
f. Replacement of aeration tank influent and effluent gates.
g. Removal and relocation of slide gates in each aeration tank.
h. Adjustments to relevel aeration tank and secondary clarifier effluent weirs.
i. Blower room ventilation improvements.
j. Instrumentation and SCADA system upgrades.
k. Safety upgrades including aeration tank railing and grating replacement
and associated concrete repairs.
l. Repair and replacement of sewer service pipe