
Is seeking qualified DBEs, MBEs, WBEs
Outreach Coordinator
Samanthea Totten-Perry
Project Estimator
Hap Paulson
Telephone
(541) 887-8510
Fax
(541) 884-3567
Address
4815 Tingley Lane Ste. A
Klamath Falls, OR 97603
Project Name
NEWELL SEWER COLLECTION, PUMPING STATION and LAGOON IMPROVEMENTS
Bid/Contract #
--
Awarding Agency
Newell County Water District
Project Location
Newell, Modoc County, CA
Bid Date
08/27/2020 at 02:00
Project Details
We are seeking quotes for the following scope of work: At the lagoon site, regrade the percolation bed site, remove existing rip rap, remove dried sludge and haul and spread at nearby disposal area, regrade lagoons, install a liner in each lagoon cell, remove and install new outlet structures and cross piping for each lagoon, remove and replace inlet valving, furnish and install gravel entrance area.
At the townsite, the work shall consist of video inspection of the existing sewer; furnishing and installing a maximum of 14,900 feet of sanitary sewer and appurtenances; 4,332 feet of sewer force main, a sewage pumping station and related items, a sewage comminutor, demolition and removal of 2 sewage pumping stations, and demolition of old manholes and cleanouts, and improvements at the sewage lagoon.
The bid proposal is divided into a Base bid and Alternatives. Bidders must bid all schedules. The Base bid comprises the bulk of the work but omits much of the new sewer. The new sewer installation is mostly in the alternatives. The District will award the contract to the bidder whose bid maximizes available funds.
Rocky Mountain Construction, L.L.C. will work with suppliers and subcontractors to break-down work items into smaller more manageable opportunities.
The Contract Documents for this project are available electronically and free of charge for download via the internet at www.ciplist.com. This site is the only approved location for subcontractors and suppliers to obtain official Contract Documents. A courtesy copy for viewing purposes only will be available at the main office of Rocky Mountain Construction, L.L.C.
Subcontractors must possess a current contractor's license and comply with all California registration requirements. All subcontractors are required to obtain a Department of Industrial Relations registration number and provide the number to RMC at bid time with their quote. Subcontractors must have worker's compensation and insurance coverage at limits acceptable to RMC during the length of the prime contract and include Waiver of Subrogation to RMC on insurance policies. RMC may require subcontractors to provide 100% performance and payment bonding for their value of work. If required by RMC, we will reimburse bonding costs up to 1.5% of the total subcontract value. If we can be of assistance with providing specs, plans, obtaining bonding, insurance, materials and/or supplies or have any questions related to the referenced project, please contact our office at (541)882-8377. RMC is an Equal Opportunity Employer and will consider all bids that may be submitted.
How to get in touch
Outreach Coordinator
Samanthea Totten-Perry
Project Estimator
Hap Paulson
Telephone
(541) 887-8510
Fax
(541) 884-3567
Address
4815 Tingley Lane Ste. A
Klamath Falls, OR 97603