DBEGoodFaith.com


MALCOLM DRILLING COMPANY INC.

Is seeking qualified MBEs, WBEs, San Francisco LBEs



Outreach Coordinator
Tian Yu Dong

Project Estimator
Tian Yu Dong

Telephone
(510) 780-9181

Fax
(510) 780-9167

Address
3503 Breakwater Ct
Hayward, CA 94545


Project Name
SEWPCP Biosolids Digester Facilities

Bid/Contract #
WW-647R Scope II

Awarding Agency
San Francisco Public Utilities Commission

Project Location
San Francisco, San Francisco County, CA

Bid Date
05/22/2020 at 13:59

Project Details
Spoil Handling, SWPPP planning and implementation, Mass excavation and backfill, Pile chipping, Pile removal, Survey, Trucking, Security, Resteel, Asphalt paving, Street sweeping, Concrete pumping, Concrete supply, Testing, Traffic management, Concrete Washout, Stairtower erection and rental, Contaminated soils testing, On Site demolition, Pre trenching, Work platform construction, Base rock placement


Plans/Specs for this project are available by request through Tian Dong at tdong@malcolmdrilling.com. Please fill out attached NDA and send to Tian with your request for plans/specs or they can be viewed at Malcolm
Drilling's office located at 3503 Breakwater Court Hayward, CA 94545 between the hours of
8am - 5pm, Monday to Friday. If you need assistance with bonding, credit, insurance, or technical
assistance with the plans and specs, please call us at 510.780.9181. 100% Payment and Performance
bonds may be required. Additionally, please call us if you
need assistance in obtaining equipment, supplies, or materials for this project. We look forward to
working with you on this project, please email us your quote at tdong@malcolmdrilling.com. If you
have technical questions regarding this bid, please contact Tian Dong at 510.780.9181 or
tdong@malcolmdrilling.com.

How to get in touch


Outreach Coordinator
Tian Yu Dong

Project Estimator
Tian Yu Dong

Telephone
(510) 780-9181

Fax
(510) 780-9167

Address
3503 Breakwater Ct
Hayward, CA 94545


Plans, specs, and other bid documents