Scope of Wok: Replace ALL (E) aluminum windows on the second and third floors, except for the five banks of windows along Washburn Street between adjacent building (170 9th Street) and closest pilaster to adjacent building.
Exterior/interior patching and refinishing around the windows to match the existing finishes. There is also hazmat abatement.
The time allowed for completion is 180 consecutive calendar days. The Engineer's estimate is approximately $1,700,000.