DBEGoodFaith.com


SnL Group, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Tommi Compton

Telephone
(530) 222-5048

Fax
(530) 222-5140

Address
9818 Holton Way
Redding, CA 96003


Project Name
Construction of Eastside Road Over Olney Creek Bridge Project

Bid/Contract #
Job No. 2477 / Bid Schedule No. 5180

Awarding Agency
City of Redding

Project Location
Redding, Shasta County, CA

Bid Date
01/25/2022 at 03:00

Project Details
We are seeking quotes for subcontractors & suppliers for, but not limited to; SWPPP, Traffic Control, Construction Area Signs, Surveying & Staking, Aggregate materials, Pavement Markings, Signal System, Trucking, Catch Basin, Storm Drain materials, Pavement Fabric, K-Rail & Railing, Fencing, Creek Diversion, Excavation, Paving, Asbestos removal, Pipe PVC & Storm, Shoring, Concrete and Concrete Pumping, Steel, Tree Removal, Bridge Remove and Replace, Biologist and Rebar and for Major work including, but is not limited to: Removal of existing bridge, Construction of a new bridge, Retaining walls, Road construction work, Sidewalks, curb and gutter, Traffic control & traffic handling, Utility coordination, relocations and installation, Storm water pollution control.

SnL Group, Inc.'s estimator can be reached at the office (530) 222-5048, and is available to provide you with any assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. SnL Group, Inc. may also assist in obtaining any necessary equipment, supplies, materials or related services.

Plans, specifications and project requirements may be reviewed at our office in Redding, CA. They can also be viewed and downloaded online at https://ciplist.com/plan/?Redding/city/13032/plan/4219

Wage Requirements are Prevailing Wage for the State of California and Davis Bacon www.dir.ca.gov (https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html). Insurance Requirements: each subcontractor must submit proof of work comp insurance and obtain work comp throughout the completion of the project.

Requirements: by submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. SnL's written subcontract documents execution is required of all successful subcontract bids.

Subcontractor quotes are required to be submitted with forms: P10 and P12 from the bid documents

SnL Group, Inc. is available to discuss breaking out any portion of work to encourage minority participation. DBE project goal is 19%.
DBE's can no longer self-certify, and DBE firms must be certified by the California Unified Certification Program (CUCP) (https://dot.ca.gov/programs/civil-rights/dbe-search). If an entity holds this certification, it is considered acceptable for establishing status under the DBE Program.

How to get in touch


Outreach Coordinator
Tommi Compton

Telephone
(530) 222-5048

Fax
(530) 222-5140

Address
9818 Holton Way
Redding, CA 96003