DBEGoodFaith.com


Ghilotti Construction Company, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Estimating Department

Project Estimator
Jim Petnic (jimp@ghilotti.com) and Rod Barber (rod@ghilotti.com)

Telephone
(707) 585-1221

Fax
(707) 585-1601

Address
246 Ghilotti Ave
Santa Rosa, CA 95407


Project Name
Excavation, HMA, Structural Concrete, Minor Concrete & Drainage - Hwy 80

Bid/Contract #
04-0A7724

Awarding Agency
Department of Transportation (Caltrans)

Project Location
Berkeley & Albany, Alameda County, CA

Bid Date
11/04/2021 at 14:00

Project Details
Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for construction (Excavation, HMA, structural concrete, minor concrete and drainage) on Hwy. 80 in Alameda County in Berkeley and Albany from 0.6 Mile North of University Avenue Overcrossing to 0.3 Mile South of El Cerrito Separation and Overhead (04-Ala-80-6.4/6.8). Quotes requested include, but are not limited to, the following scopes of work: FABRIC & OILS, CAS, TRAFFIC CONTROL, TEMPORARY K-RAIL, RESET-ADJUST ROADWAY ITEMS, COLD PLANE, LANDSCAPE / HIGHWAY PLANTING, HYDROSEED, EROSION CONTROL, IRRIGATION, ASPHALT PAVING, CIDH PILES, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, REINFORCING STEEL, SIGN STRUCTURE, ROADSIDE SIGNS, CLEAN & PAINT STEEL, ALTERNATIVE PIPE CULVERT, FENCING, MBGR, CONCRETE BARRIER, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, SIGNAL & LIGHTING, MESSAGE SIGNS, LIGHTING & SIGN ILLUMINATION, RAMP METERING SYSTEM, SWPPP PLANNING, STORM DRAIN (UNDERGROUND), LIGHTWEIGHT CELLULAR CONCRETE BACKFILL, 6" HIGH DENSITY POLYETHELENE PIPE (GRAVITY), 6" DUCTILE IRON PIPE (FORCE MAIN), CONNECT TO EXISTING SS MH, STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Engineer's Estimate: $23,400,000 / DBE Goal: 17% / 350 WD (600 including plant establishment) / $13,500 per day LD. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.

Mr. Jim Petnic and Mr. Rod Barber (707/585-1221 or jimp@ghilotti.com and rod@ghilotti.com) are the Estimators for this project and available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: GCC may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. GCC will pay bond premiums up to 1 ½% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)

Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the Department of Transportation via their website at http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html. Plans may also be viewed or purchased through local plan rooms, builder's exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.

Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form 'CG-2010-1185' or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.

How to get in touch


Outreach Coordinator
Estimating Department

Project Estimator
Jim Petnic (jimp@ghilotti.com) and Rod Barber (rod@ghilotti.com)

Telephone
(707) 585-1221

Fax
(707) 585-1601

Address
246 Ghilotti Ave
Santa Rosa, CA 95407