DBEGoodFaith.com


SnL Group, Inc.

Is seeking qualified MBEs, WBEs, SBA MBEs, WOSBs



Outreach Coordinator
Tommi Compton

Telephone
(530) 222-5048

Fax
(530) 222-5140

Address
9818 Holton Way
Redding, CA 96003


Project Name
California Alley Utility Improvement PRoject

Bid/Contract #
Job No. 2660 / Bid Schedule No. 5228

Awarding Agency
City of Redding

Project Location
Redding, Shasta County, CA

Bid Date
10/14/2021 at 03:00

Project Details
SnL Group, Inc. is seeking quotes from all qualified vendors, subcontractors, service and material providers, including all certified MBEs/WBEs for the following items of work per plans and specs, including but not limited to: sanitary sewer materials and appurtenances (pipe, manhole, etc.), trench shoring and sheeting, trucking; dump trucks, transfers, water & concrete trucks, traffic control, construction signs, water pollution control plan, aggregate materials; asphalt, concrete/slurry, base, rock, sand etc., paving, surveying, excavation, pothole, concrete & pavement recycling, asbestos abatement, CCTV Inspection, and pipe bursting.
SnL Group, Inc. is available to discuss breaking out any portion of work to encourage minority participation.

SnL Group, Inc.'s estimator can be reached at the office (530) 222-5048, and is available to provide you with any assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. SnL Group, Inc. may also assist in obtaining any necessary equipment, supplies, materials or related services.

Plans, specifications and project requirements may be reviewed at our office in Redding, CA. They are also available online at https://ciplist.com/plan/?Redding/city/13032/plan/4113

Wage requirements are prevailing wage rates for Shasta County, set forth by the State of California, Dept. of Industrial Relations at www.dir.ca.gove/DLSR/PWD. Each subcontractor must submit proof of current and active DIR Contractor Registration when submitting a quote.

Insurance requirements: each subcontractor must submit proof of workers compensation insurance and obtain work comp throughout the completion of the project.

Requirements: by submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. SnL's written subcontract documents execution is required of all successful subcontract bids.

MBEs/WBEs must be submit proof of certification with proposal, and must be registered with US Small Business Administration (SBA), Minority Business Development Agency (MBDA) of the US Department of Commerce (DOC) and California Department of Transportation-Business Enterprise Program CalCert database.

How to get in touch


Outreach Coordinator
Tommi Compton

Telephone
(530) 222-5048

Fax
(530) 222-5140

Address
9818 Holton Way
Redding, CA 96003