DBEGoodFaith.com


Skanska USA Civil West California District Inc.

Is seeking qualified DBEs



Outreach Coordinator
Irene Rumbaugh

Project Estimator
Jeanine Soriano

Telephone
(951) 684-5360

Fax
(951) 788-2449

Address
1995 Agua Mansa Road
Riverside, CA 92509


Project Name
Rosecrans/Marquardt Grade Separation Project

Bid/Contract #
IFB No. C77307C1210

Awarding Agency
Los Angeles County Metropolitan Transportation Authority

Project Location
Los Angeles, Los Angeles County, CA

Bid Date
10/06/2021 at 14:00

Project Details
Subcontractor/Supplier Bids/Proposals Requested For
ROSECRANS/MARQUARDT GRADE SEPARATION PROJECT
Los Angeles, California RFP #C77307C1210
Owner: Los Angeles County Metropolitan Transportation Authority (METRO Proposal Due Date: September 22, 29, 2021 - 2:00 PM
DBE Goal - 12%

This advertisement is in response to Metro's DBE Program. Skanska USA Civil West California District Inc. intends to conduct itself in "Good Faith" with DBE firms regarding participation on this project. Requested scopes include, but are not limited to the following and should be based on the project IFB, Contract, and all amendments:

Aggregates, Ready Mix Concrete, Bridge Bearing Pads, Erosion Control materials, precast girders, Precast Deck Panels, Formliner, Join Seal Assembly, Pipe Supply, Rip Rap, MSE Panels, Erosion Control, Asbestos Mitigation/Removal, Furnish and Erect Precast Concrete Girders, Signs, Bar Reinforcing Steel, Minor Concrete Flatwork, Midwest Guardrail System, Fence & Railing, Electrical, CIDH Concrete Piling, Asphalt Paving, Concrete Pavers, Striping, Landscape, Irrigation, Wet Utilities, Storm Drain, Clear & Grub, Survey, Quality Control, Photographic Documentation, Pre-Post Construction Survey, Trucking, Sweeping.

Plans & Specs can be viewed at our main office in Riverside (call or email for appointment) and Building Connected at bit.ly/Skanskaplanroom


This contractor and subcontractor(s) shall abide by the requirements of 41 CFR 60-300.5(a) and 60-741.5(a). These regulations prohibit discrimination against qualified individuals on the basis of protected veteran status or disability, and require affirmative action by covered prime contractors and subcontractors to employ and advance in employment qualified protected veterans and individuals with disabilities.

Assistance: Skanska intends to conduct itself in good faith with all interested subcontractors as well as certified DBE firms looking for subcontract opportunities on this project. Subcontractors may be requested to furnish a bond. Please call if we can assist you in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. Assistance to DBE subcontractors and suppliers in obtaining bonding, lines of credit, or other capital financing is available through the DOT Bond Assistance Program at (800) 532-1169. You may also contact Merriwether and Williams Insurance Services at (213) 258- 3000 or online at http://.imwis.com for Metro's Bonding Assistance Pilot Program that assists DBEs by providing technical and administrative assistance as well as providing the opportunity to expand their bonding capacity. Under the Program, Metro will provide a bond guarantee to qualified prospective contractors and subcontractors looking to increase their bonding capacity.
Subcontracting Requirements: Skanska's insurance requirements are Commercial General Liability (GL): $1M ea. occ., $1M personal injury, $2M products & completed operations agg. & general agg.;
$1M Auto Liability; $5M Excess/Umbrella and $1M Workers Comp. Endorsements and waivers required are the Additional Insured End., Primary Wording End., & a Waiver of Subrogation (GL & WC). Other insurance requirements may be necessary per scope or RFP requirement. Subcontractors may be required to furnish performance & payment bonds in the full amount of their subcontract by an admitted surety & subject to approval by Skanska will pay bond premium up to 1%. Quotations must be valid for the same duration as specified by the Owner for contract award. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. Skanska and Stacy and Witbeck D20, JV is signatory to the Operating Engineers, Laborers, Cement Masons, & Carpenters Unions. Subcontractors must provide weekly, one original and one copy of all certified payrolls, including non-performance and fringe benefit statements if required by law or by the Prime Contract. Please note that all Contractors and Subcontractors must register with The DIR (Department of Industrial Relations) in order to bid on public works projects. Include CSLB License Number and DIR Number on All Quotes Submitted.

Skanska USA Civil West California District is an Equal Opportunity/Affirmative Action Employer and EEO/AA/Vet/Disability Employer
Estimating Department: 1995 Agua Mansa Rd, Riverside, CA 92509 Phone: (951) 684-5360, Fax: (951) 788-2449
Lead Estimator: Jeanine Soriano - Email: bids.socal@skanska.com

How to get in touch


Outreach Coordinator
Irene Rumbaugh

Project Estimator
Jeanine Soriano

Telephone
(951) 684-5360

Fax
(951) 788-2449

Address
1995 Agua Mansa Road
Riverside, CA 92509