DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Erin Hutchison

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Roadway excavation, JPCP and furnish polyester concrete overlay

Bid/Contract #
03-1H18U4

Awarding Agency
California Department of Transportation

Project Location
Truckee, Nevada County, CA

Bid Date
10/05/2021 at 14:00

Project Details
FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following items of work including but not limited to: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Type III Barricade, Temp. Traffic Stripe, Plastic Traffic Drums, Portable Radar Speed Feedback Sign System, Temp. Pedestrian Access Route, Portable Changeable Message Sign, Temp. K-Rail, Temp. Crash Cushion, Temp. Traffic Screen, SWPPP, Temp. Erosion Control, Street Sweeping, Temp. Concrete Washout, Temp. Creek Diversion Systems, Treated Wood Waste, Temp. High-Visibility Fence, Clear & Grub, Roadway Excavation, Shoulder Backing, Check & Test Irrigation, Erosion Control, Incorporate Materials, Class 2 AB, Base Bond Breaker, Hot Mix Asphalt, HMA Dike, Cold Plane AC Pavement, Drill and Bond (Dowel Bar & Tie Bar), Joint Seal, Remove Concrete Pavement, Grind Existing Concrete Pavement, CIDH Concrete Pile, Structural Concrete, Sign Structure, Polyester Concrete Overlay, Plastic Pipe, Reinforced Concrete Pipe, Corrugated Steel Pipe & Steel Pipe Downdrain, Anchor Assembly, Alt. Flared End Section, Abandon Culvert/Inlet, Remove Overside Drain/Culvert/Inlet/Flared End Section, Cleaning/Inspecting/Preparing Culvert, Sand Backfill, Cured-In-Place Pipeliner, Concrete (Ditch Lining), Rock Slope Protection, Remove Concrete, Pre/Post Construction Surveys, Misc. Iron & Steel, Manhole Frame & Cover, Delineator, Roadside Sign, Furnish & Install Signs, Guardrail, Alt. Crash Cushion, Striping & Markings, Electrical, Ready Mix Concrete.

Engineers Estimate: $22,300,000.00
DBE Goal: 18%
Job Duration: 170 WD

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Bid documents are also available on the Caltrans website at the following link: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=03-1H18U4. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Erin Hutchison

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550