DBEGoodFaith.com


James W. Fowler Co.

Is seeking qualified COBID-Certified Firms



Outreach Coordinator
Sonja Sommerfeldt

Project Estimator
Todd Pittman

Telephone
(503) 623-5373

Fax
(503) 623-9117

Address
15347 Suquamish Way NE
Dallas, OR 97338


Project Name
Erickson Trunk Sewer and Water System Ph. 2

Bid/Contract #
3804-21B

Awarding Agency
City of Beaverton

Project Location
Beaverton, Washington County, OR

Bid Date
05/20/2021 at 02:00

Project Details
The City of Beaverton is accepting will only accept electronic bids for the project, Erickson Trunk Sewer and Water System Ph. 2, CIP Project No. 6107. The project consists of installing 970 lineal feet of 21" sewer pipe and 1,500 lineal feet of 18" sewer pipe from 5th St/Erickson Ave to 10th St. The new design alternative relocates the existing 15" trunk sewer from the creek area to improve maintenance access. The upsized line will provide additional flow capacity. Additionally, 980 lineal feet of 8" sewer mainline and 610 lineal feet of 6" sewer will be installed to replace old sewer and tie into the trunk sewer. There is also 1,570 lineal feet of 12" ductile iron waterline to be installed in Erickson Ave. 1,360 lineal feet of 8" waterline and 600 lineal feet of 6" waterline to be installed between 9th St. and 5th St. throughout the Condos and pedestrian pathway. Pedestrian pathway from/ 5th St. to 10th St. will be re-paved.

Subcontracting and supplier opportunities are available but not limited to the following categories of work:

SUBCONTRACTORS: Flagging; Landscaping; Boring; Asphalt Paving; Concrete Cutting; Fencing; Striping; and Concrete Work.

Please follow the below link for plans, specifications, and addenda issued for this project:

http://www.jwfowler.com/bidopportunities/

How to get in touch


Outreach Coordinator
Sonja Sommerfeldt

Project Estimator
Todd Pittman

Telephone
(503) 623-5373

Fax
(503) 623-9117

Address
15347 Suquamish Way NE
Dallas, OR 97338