DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Erin Hutchison

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Roadway Excavation, Jointed Plain Concrete Paving and Chain Link Fence

Bid/Contract #
07-4V1004

Awarding Agency
California Department of Transportation

Project Location
Compton, Los Angeles County, CA

Bid Date
05/25/2021 at 14:00

Project Details
FBD Vanguard Construction, Inc. is requesting quotes from DBE firms for the following items of work including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temporary K-Rail, Prepare Water Pollution Control Program, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Temporary Concrete Washout, Treated Wood Waste, Roadway Excavation, Embankment, Roadside Clearing, Hydromulch, Hydroseed, Permanent Erosion Control Establishment Work, Class 3 Agg. Base, Ready Mix Concrete (For Lean Concrete Base Rapid Setting & Jointed Plain Concrete Pavement RSC), Remove AC Pavement, Chain Link Fence & Chain Link Gate, Guard Railing Delineator, Midwest Guardrail System (Wood Post), Concrete Barrier (Type K), Transition Railing (Type WB-31), Alternative In-Line Terminal System, Guardrail Remove, Concrete Barrier (Type K) Removal, Maintain Existing Traffic Management System Elements During Construction, Temporary Camera Systems, Modify Ramp Meter Systems, Modify Camera Systems.

Time of Completion: 100 WD
Engineers Estimate: $920,000.00
DBE Goal: 15%

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans & specs may also be downloaded from the Caltrans website at the following link: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=07-4V1004.
FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Erin Hutchison

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550