Is seeking qualified DBEs, MBEs, WBEs, DVBEs, SBEs
Outreach Coordinator
William Nordberg
Project Estimator
Kate Jurczyk
Telephone
(781) 290-1000 Ext. 1007
Fax
(781) 290-1001
Address
400 Totten Pond Road
Waltham, MA 2451
Project Name
Sumner/Callahan Tunnel Vent Bldgs Upgrades
Bid/Contract #
606660-113976
Awarding Agency
MassDOT
Project Location
Boston, Suffolk County, MA
Bid Date
05/17/2021 at 09:00
Project Details
MEC is performing as the prime contractor looking for multiple subcontractor scopes. Tunnel work is involved. We are seeking quotes for SCADA system, paving & marking, site work, fire alarm, fire standpipe, rodent control, noise control, health & safety program, licensed site professional (LSP) services, disposal of regulated/unregulated soil & hazardous waste, testing/abatement for asbestos, treatment/disposal of contaminated groundwater, testing/disposal of PCB ballasts, frame & grate, access hatches, asphalt patching & emulsion, wall panel removal, general demolition, door installation, fence work, mechanical (pumps & fuel oil piping), constructing walls/ceilings, structural steel platforms, install fire hydrants & water service, concrete work, stairs & handrails, bar screen assemblies.
Prevailing Wage / Certified Payroll Required
Must be certified through the Massachusetts Supplier Diversity Office.
Fire Alarm - Fire Alarm device installers must be certified by NICET as a fire alarm level III technician.
For access to contract documents, please reach out to William Nordberg at wnordberg@masselec.com or 781-290-1007
How to get in touch
Outreach Coordinator
William Nordberg
Project Estimator
Kate Jurczyk
Telephone
(781) 290-1000 Ext. 1007
Fax
(781) 290-1001
Address
400 Totten Pond Road
Waltham, MA 2451