DBEGoodFaith.com


James W. Fowler Co.

Is seeking qualified DBEs



Outreach Coordinator
Sonja Sommerfeldt

Project Estimator
Doug Ide

Telephone
(503) 623-5373

Fax
(503) 623-9117

Address
12775 Westview Drive
Dallas, OR 97338


Project Name
Meadowdale Beach Park and Estuary Restoration

Bid/Contract #
PW-002-21SB

Awarding Agency
Snohomish County Purchasing Division

Project Location
Edmonds, Snohomish County, WA

Bid Date
03/09/2021 at 11:00

Project Details
The contemplated work to be performed under this contract includes, but is not limited to, demolition and clearing; earthwork; support BNSF Railway (BNSF) construction crews with construction of a multispan railroad bridge, and fencing; geotechnical reinforcement and repaving of an access road; concrete and asphalt and crushed rock paving for park pathways; restoration of an estuarine tidal marsh, stream and riparian areas; construction of a restroom enclosure; replacement of a picnic shelter roof; installation of a pre-fabricated pedestrian bridge, construction of pedestrian bridge abutments and guardrails; boardwalk construction; installation of site furnishings, a new irrigation system, landscape top soils, erosion control fabrics, and planting; and improvements to utilities, including water service, storm drainage, and electrical, including lighting.

Subcontracting and supplier opportunities are available but not limited to the following categories of work: quality control testing subcontractor; flagging/traffic control subcontractor; surveying subcontractor; demolition subcontractor; site clean up subcontractor; concrete supplier; rebar subcontractor; cast-in-place concrete subcontractor; grouting subcontractor; concrete cutting & boring subcontractor; saw cutting subcontractor; structural steel framing subcontractor; metal fabrication subcontractor; wood, plastic, and composite subcontractor; rough carpentry subcontractor; metal roofing subcontractor; coating/painting subcontractor; signage subcontractor; electrical subcontractor; clearing and grubbing subcontractor; fill and backfill subcontractor; excavation subcontractor; erosion control subcontractor; asphalt paving subcontractor; aggregate supplier; curbs, gutters and sidewalks subcontractor; pavement marking subcontractor; fencing subcontractor; irrigation subcontractor; landscaping subcontractor; underground utilities subcontractor; trucking (dump trucks) subcontractor; shoring subcontractor; sheet metal flashing and trim subcontractor; engineered steel truss pedestrian bridge subcontractor; spiral nailing subcontractor; sheet piling subcontractor; landslide protective barrier subcontractor; and waterway bank protection subcontractor.

Engineer's Estimate: $7,591,760.00

Participation Goals: DBE - 4.87%

James W. Fowler Co. is an equal opportunity employer and we are requesting qualified subcontractor and supplier bids from all interested firms, including disadvantaged and other business enterprises. Where economically feasible, we are willing to divide total contract requirements into smaller portions or quantities to permit maximum participation by DBE firms. Please contact us to discuss opportunities available.

James W. Fowler Co. will assist DBE subcontractors in obtaining necessary equipment, supplies, or materials. We are also available to provide assistance in obtaining bonding, lines of credit and/or insurance to DBE subcontractors. Please complete all negotiations 24-hours prior to bid opening. We also encourage the utilization of apprentices for this project.

Bid documents can be obtained from Snohomish County or from James W. Fowler Co. The plans and specs are available at no cost on the James W. Fowler Co. website at jwfowler.com. For more informat

Please follow the below link for plans, specifications and addenda issued for this project:

http://www.jwfowler.com/bidopportunities/

How to get in touch


Outreach Coordinator
Sonja Sommerfeldt

Project Estimator
Doug Ide

Telephone
(503) 623-5373

Fax
(503) 623-9117

Address
12775 Westview Drive
Dallas, OR 97338