DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Reconstruct roadway with roadway excavation, place HMA and CRCP

Bid/Contract #
10-1C1704

Awarding Agency
Cal Trans

Project Location
Merced, Merced County County, CA

Bid Date
11/18/2020 at 02:00

Project Details
LEAD COMPLIANCE PLAN; CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM; FLASHING ARROW SIGN; TYPE III BARRICADE; TEMPORARY TRAFFIC STRIPE; CHANNELIZER; PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY; TEMPORARY PAVEMENT MARKER; PORTABLE CHANGEABLE MESSAGE SIGN; TEMPORARY RAILING; TEMPORARY CRASH CUSHION MODULE; TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM; PREPARE STORM WATER POLLUTION PREVENTION PLAN; TEMPORARY DRAINAGE INLET PROTECTION; TEMPORARY FIBER ROLL; TEMPORARY SILT FENCE; TEMPORARY CONSTRUCTION ENTRANCE; STREET SWEEPING; TEMPORARY CONCRETE WASHOUT; TREATED WOOD WASTE; TEMPORARY HIGH-VISIBILITY FENCE; SHOULDER BACKING; PACKET FERTILIZER; PLANT; MAINTAIN EXISTING PLANTED AREAS; PLANT ESTABLISHMENT WORK; WOOD MULCH; CHECK AND TEST EXISTING IRRIGATION FACILITIES; OPERATE EXISTING IRRIGATION FACILITIES; HYDROMULCH; HYDROSEED; COMPOST; CLASS 2 AGGREGATE SUBBASE; AGGREGATE BASE; HOT MIX ASPHALT; PLACE HOT MIX ASPHALT; TACK COAT; COLD PLANE ASPHALT CONCRETE PAVEMENT; CAST-IN-DRILLED-HOLE CONCRETE PILE; JOINT SEAL; FURNISH SIGN STRUCTURE; INSTALL SIGN STRUCTURE; CONCRETE BACKFILL; TEMPORARY CULVERT; REINFORCED CONCRETE PIPE; FLUME DOWNDRAIN; FLUME ANCHOR ASSEMBLY; CONCRETE FLARED END SECTION; TEMPORARY FLARED END SECTION; REMOVE CULVERT; REMOVE DOWNDRAIN; REMOVE INLET; REMOVE HEADWALL; REMOVE ASPHALT CONCRETE OVERSIDE DRAIN; ADJUST INLET; CAP INLET; TEMPORARY CAP INLET; MISCELLANEOUS IRON AND STEEL; OBLITERATE SURFACING; REMOVE PAVEMENT MARKER; PAVEMENT MARKER; OBJECT MARKER; MIDWEST GUARDRAIL SYSTEM; VEGETATION CONTROL; SINGLE THRIE BEAM BARRIER; DOUBLE THRIE BEAM BARRIER; TRANSITION RAILING; RETURN CAP; END CAP; END ANCHOR ASSEMBLY; ALTERNATIVE IN-LINE TERMINAL SYSTEM; REMOVE GUARDRAIL; THERMOPLASTIC TRAFFIC STRIPE; REMOVE THERMOPLASTIC TRAFFIC STRIPE; REMOVE THERMOPLASTIC PAVEMENT MARKING; 12" RUMBLE STRIP; TRAFFIC STRIPE TAPE WITH CONTRAST; MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION; TRAFFIC MONITORING STATION SYSTEM; CHANGEABLE MESSAGE SIGN SYSTEM; CAMERA SYSTEMS; MODIFYING LIGHTING SYSTEMS; MODIFYING TRAFFIC MONITORING STATIONS; REMOVING TRAFFIC MONITORING STATIONS;

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans can also be viewed online at http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=10-1C1704. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550