DBEGoodFaith.com


Thompson Builders Corporation

Is seeking qualified DVBEs



Outreach Coordinator
Shannon Miller

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949


Project Name
Thurgood Marshall HS Modernization

Bid/Contract #
11907

Awarding Agency
SFUSD

Project Location
San Francisco, San Francisco County, CA

Bid Date
11/04/2020 at 02:00

Project Details
ALL POTENTIAL DVBE SUBCONTRACTORS
*********************************************************************************
THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers, but ESPECIALLY DVBE subcontractors, suppliers & truckers for the following project:

Thurgood Marshall High School Modernization, project No. 11907
Owner: SFUSD

Bid Date: 11/04/2020 @ 2:00 PM Estimate: $27,000,000

Seeking ALL subcontractors/suppliers/truckers for this project, especially DVBE subcontractors, suppliers & truckers, TRADES NEEDED (but not limited to):

DIVISION 2 - EXISTING CONDITIONS
02 41 13 Temporary Tree and Plant Protection (L)
DIVISION 3 - CONCRETE
03 10 00 Concrete Formwork (S)
03 20 00 Concrete Reinforcement (S)
03 30 00 Cast-In-Place Concrete (S)
03 37 10 Shotcrete (S)
03 39 23 Concrete Curing and Sealing
03 55 00 Resinous Composition Underlayment

03 93 00 Fiber Reinforced Polymer (S)
DIVISION 4 - MASONRY
04 21 00 Brick Veneer Masonry
DIVISION 5 - METALS
05 12 00 Structural Steel (S)
05 40 00 Cold-formed Metal Framing
05 50 00 Metal Fabrications
05 52 13 Pipe Railings
05 58 25 Stainless Steel Counters and Fabrications
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES
06 16 00 Sheathing
06 41 00 Interior Architectural Woodwork
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 14 00 Fluid-Applied Membrane Roofing/Waterproofing
07 21 00 Building Insulation
07 27 27 Fluid-Applied Membrane Air Barrier Vapor Permeable
07 42 00 Insulated-Core Metal Window Panels
07 56 10 Roofing Repairs
07 62 00 Sheet Metal Flashing and Trim
07 84 00 Penetration Firestopping
07 92 00 Joint Sealants
DIVISION 8 - OPENINGS
08 11 13 Hollow Metal Doors and Frames
08 14 00 Flush Wood Doors
08 16 13 Fiberglass Reinforced Polyester Doors
08 31 13 Access Doors and Frames
08 33 00 Rolling Service Door
08 41 13 Aluminum Framed Storefronts
08 41 16 Fire Rated Glass and Framing
08 44 13 Glazed Aluminum Curtain Walls
08 52 00 Aluminum Windows
08 71 00 Door Hardware
08 80 00 Glazing
08 91 19 Fixed Louvers
DIVISION 9 - FINISHES
09 21 16 Gypsum Board Shaft Wall Assemblies
09 21 50 Gypsum Veneer Plaster
09 22 16 Non-Structural Metal Furring
09 24 20 Portland Cement Plaster
09 29 00 Gypsum Board
09 30 13 Tiling
09 51 13 Acoustical Tile Ceilings
09 51 23 Acoustical Panel Ceilings
09 65 13 Resilient Base and Accessories
09 65 43 Linoleum Sheet Flooring


09 67 13 Resinous Composition Flooring
09 67 16 Urethane Cement Composition Flooring
09 67 23 Polyacrylate Matrix Terrazzo Flooring
09 72 00 Tackable Wall Coverings
09 77 30 Fiberglass Reinforced Panels
09 91 13 Exterior Painting
09 91 23 Interior Painting
DIVISION 10 - SPECIALTIES
10 11 00 Marker Boards
10 12 00 Bulletin Boards
10 14 00 Signage
10 14 53 Traffic Signage (C)
10 19 00 Privacy Curtains
10 21 13 Toilet Compartments
10 28 13 Toilet Accessories
10 51 13 Metal Lockers
10 52 00 Fire Protection Specialties
10 71 13 Exterior Sun Control Devices
10 71 16 Exterior Sun Control Devices for Curtain Walls
DIVISION 11 - EQUIPMENT
11 31 00 Residential Appliances
11 40 00 Foodservice Equipment (F)
11 52 13 Projection Screens
11 58 50 Specialty Classroom Equipment
DIVISION 12 - FURNISHINGS
12 24 13 Roller Window Shades
12 36 69 Quartz Agglomerate Countertops
12 93 00 Exterior Site Furnishings (L)
DIVISION 21 - FIRE SUPPRESSION
21 13 00 Fire Sprinkler Suppression System (M)
DIVISION 22 - PLUMBING
22 00 00 Plumbing Systems (M)
22 08 00 Commissioning of Plumbing Systems (Cx)
DIVISION 23 - HVAC
23 00 00 Heating Ventilating and Air Conditioning Systems (M)
23 05 00 Acceptance Requirements (M)
23 08 00 Commissioning of HVAC Systems (Cx)
DIVISION 25 - INTEGRATED AUTOMATION
25 50 00 Energy Management and Temperature Control System (M)
DIVISION 26 - ELECTRICAL
26 05 00 Electrical General Requirements (E)
26 05 10 Electrical Demolition (E)
26 05 20 Basic Electrical Materials and Methods (E)
26 05 26 Grounding and Bonding for Electrical Systems (E)
26 08 00 Commissioning of Electrical Systems (Cx)


26 09 13 EGauge Power Monitoring Communication System (E)
26 09 23 Automatic Lighting Control Equipment (E)
26 09 24 Digital Lighting Control System (E)
26 23 00 Electrical Switchgear (E)
26 32 13 Standby Generator (E)
26 36 00 Automatic Transfer Switch (E)
26 51 00 Lighting (E)
DIVISION 27 - COMMUNICATIONS
27 05 00 Voice and Data Communications System (E)
27 08 00 Commissioning
27 10 00 Structured Cabling
27 11 00 Communications Equipment
27 20 00 Data Communications
27 51 16 Integrated Communication Public Address Clock System (E)
27 53 00 Area of Rescue Assistance Signal System (E)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 16 00 Motion Detector System (E)
28 23 00 Digital Video Surveillance System (E)
28 31 11 Fire Alarm System (E)
DIVISION 31 - EARTHWORK
31 10 00 Demolition Clearing and Grubbing (C)
31 10 13 Landscape Clearing and Grubbing (L)
31 22 00 Earthwork (C)
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 00 Asphalt Pavement Aggregate Base and AC Grinding (C)
32 13 13 Concrete Paving (L)
32 16 00 Site Concrete (C)
32 17 23 Pavement Stripes and Markings (C)
32 31 13 Chain Link Fences and Gates
32 84 00 Planting Irrigation (L)
32 93 00 Plants (L)
APPENDIX A
HAZARDOUS MATERIAL SPECIFICATIONS
Prepared by: Sensible Environmental Solutions
Hazmat Abatement and Demolition Specifications Table of Contents
00 31 27 Existing Hazardous Materials Conditions
01 11 10 Summary of Hazardous Materials and Work
01 35 13 Work Procedures for Asbestos Contaminated Spaces
02 82 00 Asbestos Abatement
02 83 00 Lead-Impacted Construction & Abatement
02 84 00 PCB Ballasts, PCB Transformers, and Universal Wastes
02 85 00 Mold Remediation

Please submit bids to us by noon on bid day.




*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers' Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors' faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder's Exchanges, in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato, Monday through Friday from 7:30 AM to 4:00 PM. Plans and specifications may be emailed upon request or downloaded from the following link:
https://tpcorp.box.com/s/w085tnptr5afpsjppsi6e9tyf3ip8pxq


Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Shannon Miller
PHONE: (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

How to get in touch


Outreach Coordinator
Shannon Miller

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949