DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Precast jointed conc pvmt, individual slab replacement, HMA & RHMA. - In Contra Costa County In Concord From Route 242/680 Separation To Buchanan Field Viaduct

Bid/Contract #
04-269804

Awarding Agency
Cal Trans

Project Location
Concord, Contra Costa County, CA

Bid Date
11/17/2020 at 14:00

Project Details
CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM; AUTOMATED WORK ZONE INFORMATION SYSTEM; CHANNELIZER (SURFACE MOUNTED) PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM; DAYPORTABLE CHANGEABLE MESSAGE SIGN (LS); TEMPORARY AUTOMATED END OF QUEUE WARNING SYSTEM (TYPE 1) DAY; TEMPORARY RAILING (TYPE K); TEMPORARY ALTERNATIVE CRASH CUSHION (TL-3);SWPPP;TEMPORARY DRAINAGE INLET PROTECTION;TEMPORARY FIBER ROLL;TEMPORARY CONSTRUCTION ENTRANCEST;STREET SWEEPING;TEMPORARY CONCRETE WASHOUT;REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE);TEMPORARY HIGH-VISIBILITY FENCE;CLEARING AND GRUBBING;CEMENT COMPACTION GROUT INJECTION; HIGH DENSITY POLYURETHANE INJECTION; 12" CORRUGATED STEEL PIPE CONDUIT;HYDROMULCH;FIBER ROLLS; HYDROSEED; CRACK TREATMENT; HOT MIX ASPHALT (TYPE A); RUBBERIZED HOT MIX ASPHALT (GAP GRADED); ASPHALT BINDER (GEOSYNTHETIC PAVEMENT INTERLAYER); GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING MAT);PLACE HOT MIX ASPHALT DIKE (TYPE C) ;TACK COAT ;PLACE HOT MIX ASPHALT DIKE (TYPE F); COLD PLANE ASPHALT CONCRETE PAVEMENT; JOINT SEAL; BRIDGE REMOVAL; 12" CORRUGATED STEEL PIPE DOWNDRAIN; 12" ENTRANCE TAPER; 12" ANCHOR ASSEMBLY; 18" TO 12" CORRUGATED STEEL ECCENTRIC REDUCER; DOWNDRAIN ENERGY DISSIPATOR; 12" STEEL FLARED END SECTION; 24" STEEL FLARED END SECTION; ROCK SLOPE PROTECTION; GUARD RAILING DELINEATOR; PAVEMENT MARKER (RETROREFLECTIVE); OBJECT MARKER (TYPE P); FURNISH FORMED PANEL SIGN (OVERHEAD); FURNISH SINGLE SHEET ALUMINUM SIGN ; ROADSIDE SIGN; MIDWEST GUARDRAIL SYSTEM (STEEL POST); VEGETATION CONTROL (MINOR CONCRETE); ALTERNATIVE IN-LINE TERMINAL SYSTEM; THERMOPLASTIC PAVEMENT MARKING & STRIPING; TRAFFIC STRIPE TAPE WITH CONTRAST; MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION; MODIFYING LIGHTING SYSTEMS; MODIFYING TRAFFIC MONITORING STATIONS

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans are also available online at http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=10-1C5004. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550