DBEGoodFaith.com


Thompson Builders Corporation

Is seeking qualified DBEs, MBEs, WBE



Outreach Coordinator
Shannon Miller

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949


Project Name
Southern Heights Bridge Replacement

Bid/Contract #
--

Awarding Agency
City of San Rafael

Project Location
San Rafael, Marin County, CA

Bid Date
09/25/2020 at 11:00

Project Details
ALL POTENTIAL SUBCONTRACTORS
*********************************************************************************
THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers, but ESPECIALLY DBE subcontractors, suppliers & truckers for the following project:

Southern Heights Bridge Replacement
Owner: City of San Rafael

Bid Date: 9/23/2020 @ 10:30AM Estimate: $3,400,000

Seeking ALL subcontractors/suppliers/truckers, but especially MBE/WBE/DBE subcontractors, suppliers and truckers for this project, TRADES NEEDED (but not limited to):

18-2 MOBILIZATION
18-2.01 GENERAL 18-2.02 CPM PROGRESS SCHEDULE
18-2.03 DEVELOP WATER SUPPLY
18-2.04 CONSTRUCTION SITE MANAGEMENT
18-2.04A STREET SWEEPING
18-2.05 WATER POLLUTION CONTROL
18-2.05A PREPARE STORM WATER POLLUTION PREVENTION PLAN
18-2.05B PREPARE WATER POLLUTION CONTROL PLAN
18-2.06 ENVIRONMENTAL PROTECTIONS
18-2.06A AIR QUALITY AND NOISE 18-2.06B ARCHEOLOGICAL AND CULTURAL RESOURCES
18-2.06C TEMPORARY FENCE (TYPE ESA)
18-2.06D VIBRATION
18-2.07 TEMPORARY SITE ACCESS IMPROVEMENTS
18-2.07A TEMPORARY RETAINING WALLS
18-2.07B TEMPORARY STRUCTURE BACKFILL
18-2.07C GRAVEL FOR TEMPORARY CONSTRUCTION ACCESS
18-2.07D DRAINAGE FOR TEMPORARY CONSTRUCTION ACCESS
18-2.08 MEASUREMENT AND PAYMENT
18-3 SIGNS AND TRAFFIC CONTROL
18-3.01 GENERAL
18-3.02 PUBLIC ACCESSIBILITY
18-3.03 NO PARKING SIGNS
18-3.04 CONSTRUCTION AREA SIGNS
18-3.05 PUBLIC CONVENIENCE AND SAFETY
18-3.06 CONTRACTOR'S RESPONSIBILITY FOR
18-3.07 MEASUREMENT AND PAYMENT
18-4 CONSTRUCTION STAKING
18-4.01 GENERAL
18-4.02 RESET MONUMENTS
18-4.03 MEASUREMENT AND PAYMENT
18-5 EXCAVATION AND REMOVALS
18-5.02 ROADWAY EXCAVATION
18-5.03 TREE PROTECTION AND/OR TRIMMING
18-5.04 TREE REMOVAL
18-5.05 MISCELLANEOUS REMOVALS AND RELOCATIONS
18-5.06 MEASUREMENT AND PAYMENT
18-6 EARTHWORK
18-6.01 IMPORT BORROW
18-6.02 MEASUREMENT AND PAYMENT
18-7 COLD PLANE AC PAVEMENT
18-7.01 GENERAL
18-7.02 MEASUREMENT AND PAYMENT
18-8 AGGREGATE BASE AND TREATED PERMEABLE
18-8.01 GENERAL
18-8.02 DAILY SUBMITTAL
18-8.03 MEASUREMENT AND PAYMENT
18-9 HOT MIX ASPHALT
18-9.01 GENERAL
18-9.02 MATERIALS
18-9.03 CONSTRUCTION
18-9.04 TESTING AND CERTIFICATION
18-9.05 DAILY SUBMITTAL
18-9.06 MEASUREMENT AND PAYMENT
18-10 MINOR CONCRETE
18-10.01 GENERAL
18-10.02 DAILY SUBMITTAL
18-10.03 MEASUREMENT AND PAYMENT
18-11 STORM DRAIN IMPROVEMENTS
18-11.01 GENERAL
18-11.02 DROP INLET AND TURNING STRUCTURE
18-11.03 STORM DRAIN PIPE
18-11.04 MEASUREMENT AND PAYMENT
18-12 STEEL BACKED TIMBER BARRIER
18-12.01 GENERAL
18-12.02 MEASUREMENT AND PAYMENT
18-13 ROADSIDE SIGNS
18-13.01 GENERAL
18-13.02 ROADSIDE SIGN REMOVAL
18-13.03 ROADSIDE SIGN INSTALLATION
18-13.04 OBJECT MARKERS AND DELINEATORS
18-13.05 MEASUREMENT AND PAYMENT
18-14 TRAFFIC STRIPES AND PAVEMENT MARKINGS
18-14.01 GENERAL
18-14.02 THERMOPLASTIC STRIPING AND PAVEMENT MARKINGS
18-14.03 PAVEMENT MARKERS
18-14.04 TEMPORARY PAVEMENT DELINEATION
18-14.05 MEASUREMENT AND PAYMENT
STRUCTURES TECHNICAL SPECIFICATIONS
18-15 EARTHWORK
18-16 PILING
18-17 CONCRETE STRUCTURES
18-18 STRUCTURAL STEEL COATINGS
18-19 EXISTING STRUCTURES
18-20 MISCELLANEOUS METAL
18-21 INCIDENTAL CONSTRUCTION
18-22 RAILINGS AND BARRIERS
18-23 FALSEWORK TRESTLE
18-24 LANDSCAPE IMPROVEMENTS
18-24.01 GENERAL
18-24.02 IRRIGATION SYSTEM
18-24.03 TREE PLANTING
18-24.04 PERMANENT EROSION CONTOROL
18-24.05 LANDSCAPE MAINTENANCE
18-24.06 RECONSTRUCT WOOD FENCE
18-24.07 GRAVITY BLOCK RETAINING WALL
18-24.08 POST AND CABLE RAILING
ELECTRICAL TECHNICAL SPECIFICATIONS
18-25 BRIDGE LIGHTING
18-26 GENERAL
18-27 ELECTRIAL SYSTEMS

Please submit bids to us by 7am on bid day.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

How to get in touch


Outreach Coordinator
Shannon Miller

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949