DBEGoodFaith.com


Thompson Builders Corporation

Is seeking qualified DBEs



Outreach Coordinator
Shannon Miller

Project Estimator
Lee Jones

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949


Project Name
01-0E7204 Roadway Excavation

Bid/Contract #
01-0E7204

Awarding Agency
CALTRANS

Project Location
NA, Lake County County, CA

Bid Date
06/23/2020 at 02:00

Project Details
Construction area signs, lead compliance plan, trucking, water trucks, HMA and RHMA material supplier, tack oil supplier, traffic control, job site management, temporary items (concrete washout, railing Type K, traffic stripe paint, drainage inlet protection, alternative temporary crash cushion, crash cushion, Hydraulic mulch, cover, check dams, erosion control move-in/move-out, fiber rolls, fence Type BW ) cold plane asphalt, portable changeable message signs, storm water pollution prevention plan, portable radar speed feedback sign systems, storm water annual report, storm water sampling and analysis, rain event action plan, pavement markers, shoulder backing, install hot mix asphalt dike type A, C, D, E, place hot mix asphalt (misc. areas), channelizers surface mounted, treated wood waste, progress schedule critical path method, geosynthetic pavement

interlayer (paving fabric), contractor supplied biologist, natural resources protection plan, invasive species control, move-in/move-out erosion control, bonded fiber matrix, rolled netting, hydromulch, fiber rolls, hydroseed, compost, class II aggregate base, tack coat, structural concrete (headwall, drainage inlet), bar reinforcing steel, 8", 24", 36" alternative pipe culvert and FES, 24' 30', 36'" CSP and anchors, rail element wall, street sweeping, drainage inlet marker, geomembrane (water barrier), mechanically stabilized embankment, adjust inlet, concrete invert paving, sand backfill, 30" cured-in-place pipeliner, RSP No 1, RSP 3T, RSP 3/8T, RSP 300 LB, RSP, 150 lb, RSP 60 LB, RSP Fabric, 42" jacked welded steel pipe, fence type WM metal post, delineator, pavement marker, milepost marker, underdrain marker, culvert marker, object marker, remove/reset roadside signs, furnish single sheet alum sign 0.063 and 0.080 unframed, furnish single sheet alum sign 0.080 framed, roadside signs 1 and 2 post, midwest guardrail system 8' steel post, vegetation control minor concrete, cable railing, thermoplastic striping install and removal, 12" rumble strip.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

How to get in touch


Outreach Coordinator
Shannon Miller

Project Estimator
Lee Jones

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949