Project Name
Buck Avenue Over Alamo Creek Bridge Replacement
Bid/Contract #
--
Awarding Agency
City of Vacaville Department of Public Works
Project Location
Vacaville, Solano County, CA
Bid Date
04/09/2020 at 02:00
Project Details
DBE GOAL 13%
Descriptions of bid items including their respective measurement for payment are listed below.
MOBILIZATION
"Mobilization" shall be measured by lump sum and paid for in accordance with Section 9-1.16D
"Mobilization" of the Standard Specifications.
CONSTRUCTION AREA SIGNS
TRAFFIC CONTROL SYSTEMS
CLEARING AND GRUBBING
PROGRESS SCHEDULE (CPM)
STORMWATER POLLUTION PREVENTION PLAN
TEMPORARY CREEK DIVERSION SYSTEM
BID ITEM 11: REMOVE CHAIN LINK FENCE
BID ITEM 12: REMOVE PEDESTRIAN BARRICADE
BID ITEM 13: REMOVE ROADSIDE SIGN (METAL POST)
BID ITEM 15: BRIDGE REMOVAL
BID ITEM 19: RELOCATE ROADSIDE SIGN (ONE POST)
BID ITEM 20: ROADSIDE SIGN (ONE POST)
BID ITEM 21: TEMPORARY EXCLUSION FENCING
BID ITEM 22: TEMPORARY CHAIN LINK FENCING
BID ITEM 23: ROADWAY EXCAVATION (CITY STREET)
BID ITEM 24: CHANNEL EXCAVATION
BID ITEM 25: STRUCTURE EXCAVATION (BRIDGE)
BID ITEM 26: STRUCTURE BACKFILL (BRIDGE)
BID ITEM 27: IMPORTED BORROW
BID ITEM 28: DECOMPOSED GRANITE
BID ITEM 29: FIBER ROLL
BID ITEM 30: EROSION CONTROL (HYDROSEED)
BID ITEM 31: 3/4" AGGREGATE BASE, CLASS 2
BID ITEM 32: GEOTEXTILE FABRIC (SUBGRADE SEPARATION FABRIC)
BID ITEM 33: ASPHALT CONCRETE (TYPE A MODIFIED) (1/2")
BID ITEM 34: COLD PLANE ASPHALT CONCRETE PAVEMENT
BID ITEM 35: TEMPORARY PEDESTRIAN PATH AND BRIDGE
BID ITEM 36: 36" CAST-IN-DRILLED-HOLE PILING
BID ITEM 37: PRESTRESSING CAST-IN-PLACE CONCRETE
BID ITEM 38: STRUCTURAL CONCRETE, BRIDGE
BID ITEM 39: STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER)
BID ITEM 41: JOINT SEAL (MR 1/2")
BID ITEM 42: BAR REINFORCING STEEL(BRIDGE)
"Bar Reinforcing Steel (Bridge)" shall be measured by the pound. Bar Reinforcing Steel (Bridge) is a final
pay quantity.
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals required to perform
all work involved in bar reinforcing steel (bridge) including, but not limited to, furnishing and placing bar
reinforcing steel, furnishing and testing sample splices, complete in place, as specified in the standard
specifications, these Special Provisions, and as shown on the Project Plans shall be considered as
included in the contract unit price paid for "Bar Reinforcing Steel (Bridge)" and no additional
compensation shall be allowed therefor.
Buck Avenue over Alamo Creek Bridge Replacement 19
BP Rev: July 10, 2019
BID ITEM 43: MISCELLANEOUS METAL (BRIDGE)
"Miscellaneous Metal (Bridge)" shall be measured by the pound. Miscellaneous Metal (Bridge) is a final
pay quantity.
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals required to perform
all work involved in miscellaneous metal (bridge) including, but not limited to, furnishing and placing HSS
pipes of the sizes shown on the plans, 3/4" diameter studs, steel plates, and threaded rods, complete in
place, as specified in the standard specifications, these Special Provisions, and as shown on the Project
Plans shall be considered as included in the contract unit price paid for "Miscellaneous Metal (Bridge)"
and no additional compensation shall be allowed therefor.
BID ITEM 44: TUBULAR HANDRAIL
"Tubular Handrail" shall be measured by the linear foot. Tubular Handrail is a final pay quantity.
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals required to perform
all work involved in tubular handrail including, but not limited to, furnishing and placing tubular handrail,
nuts, steel sleeves, complete in place, as specified in the standard specifications, these Special
Provisions, and as shown on the Project Plans shall be considered as included in the contract unit price
paid for "Tubular Handrail" and no additional compensation shall be allowed therefor.
BID ITEM 45: CONSTRUCT CHAIN LINK FENCING
BID ITEM 46: CONCRETE BARRIER (TYPE 732SW)
"Concrete Barrier (Type 732SW)" shall be measured by the linear foot. Concrete Barrier (Type 732SW) is
a final pay quantity.
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals required to perform
all work involved in concrete barrier (type 732SW) including, but not limited to, forming, furnishing,
placing, and doing all work involved in constructing the concrete work, bar reinforcement including
additional reinforcement for tubular handrail, future utility conduit, excavation, and backfill, complete in
place, as specified in the standard specifications, these Special Provisions, and as shown on the Project
Plans shall be considered as included in the contract unit price paid for "Concrete Barrier (Type 732SW)"
and no additional compensation shall be allowed therefor.
BID ITEM 47: MINOR CONCRETE, CURB AND GUTTER
BID ITEM 49: MINOR CONCRETE, CURB, TYPE A1-6
BID ITEM 50: MINOR CONCRETE, MOW STRIP
BID ITEM 51: MINOR CONCRETE, SIDEWALK
BUTTERFLY VALVE, 18-INCH (BRIDGE)
AIR RELASE VALVE, 2-INCH (BRIDGE)
CONNECT TEMPORARY 18-INCH WATER LINE TO EXISTING MAIN
REMOVE EXISTING 18-INCH STEEL CYLINDER CONCRETE PIPE WATER LINE
REMOVE EXISTING 18-INCH BUTTERFLY VALVE
BID ITEM 59: CONSTRUCT 18-INCH DIP WATER LINE (BRIDGE)
BID ITEM 60: CONSTRUCT 18-INCH DIP WATER LINE (ROADWAY)
REMOVE TEMPORARY 18-INCH DIP WATER LINE
ABANDON 18-INCH STEEL CYLINDER CONCRETE PIPE WATER LINE
(BETTERMENT)
BUTTERFLY VALVE, 18-INCH (BETTERMENT)
FIRE HYDRANT ASSEMBLY (BETTERMENT)
CONNECT 18-INCH DIP WATER LINE TO EXISTING MAIN (BRIDGE AND
BETTERMENT)
BID ITEM 68: ADJUST WATER METER BOX AND LID TO GRADE
RECONNECT EXISTING WATER SERVICE
REMOVE EXISTING SEWER MANHOLE
REMOVE (E) 8-INCH SEWER
BID ITEM 74: ABANDON EXISTING 8-INCH SEWER SIPHON
CONSTRUCT 8-INCH SDR-26 PVC SEWER
CONNECT TO EXISTING SEWER MANHOLE
BID ITEM 78: RELOCATE IRRIGATION BOX
BID ITEM 79: ABANDON EXISTING 12-INCH S
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request.
*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.