Is seeking qualified DBEs, MBEs, WBEs
Outreach Coordinator
Cassie Coppini
Project Estimator
Justin Zabel
Telephone
(707) 443-6371
Fax
(707) 443-0277
Address
P.O. Box 1006
Eureka, CA 95502
Project Name
Storm Damage Repair to Bair & Stover Roads
Bid/Contract #
217375, 217376, 217529, 217530,217542
Awarding Agency
County of Humboldt
Project Location
Hoopa, Humboldt County, CA
Bid Date
04/07/2020 at 02:00
Project Details
Construction Area Signs, Traffic Control System, Temporary Railing (Type K), Prepare Water Pollution Control Program, Temporary Silt Fence, Clearing and Grubbing, Roadway Excavation, Structure Excavation, Structure Backfill, Embankment, Geosynthetic Reinforcement, Dry Seed, Fiber Rolls, Straw, Class 2 Aggregate Base, Aggregate Base (1.5" Minus Crushed Rock), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type A), Mechanically Stabilized Embankment, Perforated Plastic Pipe Underdrain, 6" Non-perforated Plastic Pipe Underdrain, Class 3 Permeable Material (Blanket), Rock Slope Protection (1/4 Ton, Method B), Relocate Existing Rock Slope Protection, Rock Slope Protection (20 lb, Class I Method B), Rock Slope Protection Fabric (Class 8), Filter Fabric (Class B)
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
How to get in touch
Outreach Coordinator
Cassie Coppini
Project Estimator
Justin Zabel
Telephone
(707) 443-6371
Fax
(707) 443-0277
Address
P.O. Box 1006
Eureka, CA 95502