Bridgeway Civil Constructors, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688


Project Name
Buck Avenue over Alamo Creek Bridge Replacement

Bid/Contract #
Project 820295 CIP File No. 880

Awarding Agency
City of Vacaville

Project Location
Vacaville, Solano County, CA

Bid Date
04/09/2020 at 02:00

Project Details
Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:

Mobilization, Construction Area Signs, Traffic Control Systems, Clearing and Grubbing, Progress Schedule (CPM), Storm Water Pollution Prevention Plan (SWPPP), Temporary Creek Diversion System, Rock Slope Protection (150lb Class III, Method B), Sheeting, Shoring and Bracing, Temporary Tree Protection, Remove Chain Link Fence, Remove Pedestrian Barricade, Remove Roadside Sign (Metal Post), Remove Metal Post, Bridge Removal, Reset Rocks, Reset Stone Edger, Reconstruct Fence (Wood), Relocate Roadside Sign (One Post), Roadside Sign (One Post), Temporary Exclusion Fencing, Temporary Chain Link Fencing, Roadway Excavation (City Street), Channel Excavation, Structure Excavation (Bridge) (F), Structure Backfill (Bridge) (F), Imported Borrow, Decomposed Granite, Fiber Roll, Erosion Control (Hydroseed), 3/4" Aggregate Base, Class 2, Geotextile Fabric (Subgrade Separation Fabric) (F), Asphalt Concrete (Type A Modified) (1/2"), Cold Plane Asphalt Concrete Pavement, Temporary Pedestrian Path and Bridge, 36" Cast-in-drilled-hole Concrete Piling, Prestressing Cast-in-Place Concrete, Structural Concrete, Bridge (F), Structural Concrete, Bridge (Polymer Fiber) (F), Structural Concrete, Approach Slab (Type EQ) (F), Joint Seal (MR = 1/2"), Bar Reinforcing Steel, (Bridge) (F), Miscellaneous Metal, Bridge (F), Tubular Handrail (F), Construct Chain Link Fencing, Concrete Barrier (Type 732SW) (F), Minor Concrete, Curb and Gutter, Minor Concrete, Low Profile Curb, Minor Concrete, Curb, Type A1-6, Minor Concrete, Mow Strip, Minor Concrete, Sidewalk, Minor Concrete, Driveway, "Construct Temporary 18-inch DIP Water Line (Sta.15+40.62 to Sta. 17+17.93)", Butterfly Valve, 18-inch (Bridge) (Sta. 15+42.90, Sta. 15+52.93 and Sta. 17+14.99), Air Release Valve, 2-inch (Bridge), Connect Temporary 18-inch Water Line to Existing Main, "Remove Existing 18-inch Steel Cylinder Concrete Pipe Water Line (Sta. 15+40.62 to Sta. 17+17.93)", "Remove Existing 18-inch, Butterfly Valve (At and Near Sta. 15+50)", "Construct 18-inch DIP Water Line (Bridge) (Sta. 15+77.27 to Sta. 16+72.21)", "Construct 18-inch DIP Water Line (Roadway) (Sta. 15+55.50 to Sta. 15+77.27, Sta. 16+72.21 to Sta. 17+11.68)" Remove Temporary 18-inch DIP Water Line "Abandon 18-inch Steel Cylinder Concrete Pipe Water Line (West of Sta. 15+42.90)" "Construct 18-inch DIP Water Line (Roadway) (West of Sta. 15+52.93)" Butterfly Valve, 18-inch (At Sta. 11+29.41) Fire Hydrant Assembly "Connect to Existing Water Main (At Sta. 10+82.62 and at Sta. 17.11.68)" "Remove Existing 18-inch Butterfly Valve (At Sta. 15+42.90)", Adjust Water Meter Box and Lid to Grade, Reconnect Existing Water Service, Construct Temporary Bypass System, Remove Existing Sewer Manhole, Modify Sewer Manhole, Remove Existing 8-inch Sewer, Abandon Existing 8-inch Sewer Siphon, Sewer Manhole, 60-inch Sewer PVC, SDR-26 8-inch Connect New 8-inch Sewer to Existing Sewer Manhole, Relocate Irrigation Box, Abandon Existing 12-inch Storm Drain, Remove Existing 12-inch Storm Drain, Remove and Replace Storm Drain Inlet, 8-inch Storm Area Drain Inlet, Storm Drain, PVC, 6-inch Storm Drain, RCP, 15-inch, Class III, 15" RCP Flared End Section, LEAD Compliance Plan, Pavement Delineation (Detail 22), Pavement Marker, Retroflective, Adjust Electrical Box and Street Light to Grade, Pipe Support (Gas Line), Pipe Support (Water Line), Rain Event Action Plan (REAP), SWPPP Annual Report

All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.

Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.

How to get in touch


Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688