Is seeking qualified SBEs
Outreach Coordinator
Heidi Faria
Project Estimator
Donat Galicz
Telephone
(510) 526-3424 Ext. 3446
Fax
(510) 526-0990
Address
1520 Fourth Street
Berkeley, CA 94710
Project Name
I-280/Foothill Expressway Off-Ramp Improvements
Bid/Contract #
Contract C19222
Awarding Agency
Santa Clara Valley Transit Authority
Project Location
Cupertino, Santa Clara County, CA
Bid Date
01/16/2020 at 02:00
Project Details
Trucking, Temporary and Permanent Erosion Control Measures, Lead Compliance Plan, Progress Schedule (Critical Path Method), Develop Water Supply, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Temporary Crash Cushions, SWPPP, Rain Event Action Plan, Storm Water Sampling, Analysis, and Annual Report, Temporary Hydraulic Mulch, Temporary Fencing, Sweeping, Treated Wood Waste, Abandon Pipeline, Clearing & Grubbing, Roadway Excavation (Type Z-2 Aerially Deposited Lead), Structure Excavation (Retaining Wall), Structure Backfill (Retaining Wall), Underground, Hydromulch, Hydroseed, Lean Concrete Base, AC Dike, Tack Coat, Cold Plane AC, CIDH Concrete Pile, Structural Concrete, Bar Reinforcing Steel, Sign Structure, Roadside Signs, Minor Concrete, Misc. Iron & Steel, Pavement Marker, Vegetation Control (Minor Concrete), Midwest Guardrail System, Transition Railing, Concrete Barrier, Striping & Marking, Electrical, Construction Staking, and Construction Materials
Donat Galicz (510-809-3498 dgalicz@ocjones.com) is the estimator on this project and he is available to provide assistance or answer questions regarding the project scope of work including bid requirements, break out of bid items, plan or spec interpretation, bonding or insurance requirements, and other bid assistance. Plans and specs are available to review at our Berkeley office, on the VTA's website or can be sent out via Building Connected. PDF format quotes should be emailed to the estimator or faxed to 510-526-0990 prior to noon on the date of the bid. Quotes from SBE Subcontractors, Suppliers and Truckers are highly encouraged. OCJ is willing to breakout any portion of work to encourage SBE participation. Subcontractors must possess a current DIR, Contractors License, and insurance and workers compensation coverage including waiver of subrogation. OCJ may require Performance and Payment bonds on subcontracts. OCJ will pay the bond premium up to 2% of the contract value. All subcontractors are required to execute OC Jones' standard subcontract agreement, comply with all insurance requirements, and name OCJ as additional insured. Copies of our agreement and insurance requirements are available upon request. OCJ is a Union contractor, and we are signatory to the Operating Engineers, Laborers, Teamsters, and Carpenters. OCJ is an Equal Opportunity Employer.
How to get in touch
Outreach Coordinator
Heidi Faria
Project Estimator
Donat Galicz
Telephone
(510) 526-3424 Ext. 3446
Fax
(510) 526-0990
Address
1520 Fourth Street
Berkeley, CA 94710