DBEGoodFaith.com


Thompson Builders Corporation

Is seeking qualified MBEs, WBEs, San Francisco LBEs, OBE & LBE



Outreach Coordinator
Sharyn Mitchell

Project Estimator
Lee Jones

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949


Project Name
Southeast Health Center Expansion & Behavioral Health Integration Project Phase 2

Bid/Contract #
1000013710

Awarding Agency
City and County of San Francisco

Project Location
San Francisco, San Francisco County, CA

Bid Date
12/18/2019 at 14:30

Project Details
ALL POTENTIAL SUBCONTRACTORS
*********************************************************************************
THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers and all LBE, MBE, WBE and OBE subcontractors, suppliers & truckers for the following project.

Southeast Health Center Expansion & Behavioral Health Integration Project Phase 2
The Work is located on Keith Street (between Bancroft Avenue and Armstrong Avenue) in San Francisco, California. The site consists of a single 52,500 S.F. lot that is fairly level and open on 3 sides to the public right-of-way on Armstrong Avenue, Keith Street, and Bancroft Avenue. The Work consists primarily of a new medical office building for the Department of Public Health (DPH) built on-site at the corner of Keith Street and Bancroft Avenue in the existing parking lot adjacent to the existing clinic building. The new clinic will be a separate standalone 2-story building with a building area over 22,000 square feet. Public spaces including a lobby and large multipurpose room, specialty medical clinic spaces, and staff support spaces will be located on the first floor. The second floor will house the medical and behavior health clinic. The Work also consists of new site utilities for the new building and site improvements including a 3-stall parking lot at Keith Street, a 27-stall fenced parking lot at the rear of the site with electric vehicle charging stations, and a plaza at the new building entry. A small portion of the Work involves the existing, single-story, 16,950 square foot building that serves as current the outpatient clinic. The existing clinic building will be occupied and operational while the new building is under construction. When the new building is completed, most staff and services except for the recently renovated dental clinic will be moved to the new building.

Owner: City and County of San Francisco
Bid Date: 12/11/2019 @ 2:30 PM Estimate: $22M

Seeking ALL subcontractors/suppliers/truckers and all LBE, MBE, WBE and OBE subcontractors/suppliers/truckers. TRADES NEEDED (but not limited to):

THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers and all subcontractors, suppliers & truckers for the following project.


DIVISION 02 - EXISTING CONDITIONS
02 38 00 Torque Down Piles
02 41 19 Selective Site Demolition
02 81 10 Environmental Management of Excavated Materials

DIVISION 03 - CONCRETE
03 10 00 Concrete Forming and Accessories
03 20 00 Concrete Reinforcing
03 30 00 Cast-In-Place Concrete
03 35 43 Polished Concrete Floor Finish
03 52 00 Lightweight Concrete Roof Insulation
03 54 15 Portland Cement Underlayment
03 56 00 Concrete Fill for Metal Pan Stairs
03 60 00 Grouting

DIVISION 05 - METALS
05 12 00 Structural Metal Framing
05 31 00 Steel Decking
05 50 00 Metal Fabrications
05 51 02 Prefabricated Metal Stairs
05 59 00 Metal Specialties
05 70 00 Decorative Metal
05 73 13 Glass Guardrail System

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 53 Miscellaneous Rough Carpentry
06 16 43 Gypsum Sheathing
06 40 23 Interior Architectural Woodwork
06 41 00 Architectural Wood Casework

DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 16 16 Crystalline Waterproofing
07 21 17 Thermal Insulation
07 26 16 Below-Grade Vapor Retarder
07 26 20 Concrete Vapor Emission Control
07 27 26 Fluid-Applied Membrane Weather Barrier
07 40 00 Composite Framing Support (CFS) Girt System
07 42 46 Cementitious Wall Panels
07 56 00 Fluid-Applied Roofing
07 62 00 Sheet Metal Flashing and Trim
07 65 00 Flexible Flashing and Underlayment
07 77 23 Roof Hatch
07 84 00 Firestopping
07 92 00 Joint Sealants

DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames
08 12 16 Aluminum Frames
08 14 23 Impact Resistive PETG Clad Wood Doors
08 31 00 Access Doors and Panels
08 32 13 Sliding All-Glass Doors
08 36 16 Barn (Sliding) Doors
08 42 13 Aluminum-Framed Entrances
08 43 13 Aluminum-Framed Storefronts
08 44 13 Glazed Aluminum Curtain Walls
08 44 29 Point - Supported Glazing System
08 62 00 Unit Skylights
08 71 00 Door Hardware
08 71 13 Automatic Door Operators
08 80 00 Glazing
08 91 00 Wall Louvers

DIVISION 09 - FINISHES
09 21 16 Gypsum Board Shaft-Wall Assemblies
09 22 16 Non-Structural Metal Framing
09 29 00 Gypsum Board
09 51 23 Acoustical Panel Ceilings
09 65 00 Resilient Flooring and Base
09 66 16 Precast Terrazzo
09 66 23 Resinous Matrix Terrazzo Flooring
09 67 18 Epoxy Floor Coating
09 82 00 Acoustic Insulation and Sealants
09 90 00 Painting and Coating

DIVISION 10 - SPECIALTIES
10 14 00 Signage
10 14 30 Site Signage
10 21 13 SCRC Toilet Compartments
10 21 23 Cubical Tracking System
10 22 39 Operable Partitions
10 26 12 Wall Protection and Corner Guards
10 28 13 Toilet Accessories
10 44 00 Fire Protection Specialties
10 51 43 Wire Mesh Partitions
10 81 50 Integrated Pest Management

DIVISION 11 - EQUIPMENT
11 16 30 Lock Boxes
11 31 00 Residential Appliances and Equipment

DIVISION 12 - FURNISHINGS
12 24 13 Roller Window Shades
12 36 61 Solid-Surfacing Countertops
12 48 13 Entrance Floor Mats
12 48 19 Entrance Floor & Frames
12 93 00 Site Furnishings and Features

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 Machine Room-Less Electric Traction Passenger Elevators

DIVISION 21 - FIRE SUPPRESSION
21 10 00 Water Based Fire Suppression System

DIVISION 22 - PLUMBING
22 04 00 General Requirements for Plumbing
22 05 00 Common Work Results for Plumbing
22 05 29 Hangers and Supports for Plumbing
22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment
22 05 53 Identification for Plumbing
22 07 00 Plumbing Insulation
22 10 00 Plumbing Piping
22 11 00 Domestic Water System
22 34 00 Domestic Water Heater
22 40 00 Plumbing Fixtures

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 00 Common Work Results for HVAC
23 05 29 Hangers and Supports for HVAC Piping and Equipment
23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment
23 05 53 Identification for HVAC Piping, Ductwork and Equipment
23 05 93 Testing, Adjusting, and Balancing for HVAC
23 07 00 HVAC Insulation
23 09 00 Instrumentation and Controls for HVAC
23 21 13 Hydronic Piping and Valves
23 30 00 HVAC Air Distribution
23 31 00 HVAC Ducts and Casings
23 33 00 Air Duct Accessories
23 34 00 HVAC Fans
23 37 00 Air Inlets and Outlets
23 52 16 Condensing Boilers
23 62 13 Packaged Air-Cooled Refrigerant Compressor and Condenser Unit
23 70 00 Air-To-Air Energy Recovery Unit
23 81 26 Split System Air Conditioners
23 81 43 Air Source Unitary Heat Pumps

DIVISION 26 - ELECTRICAL
26 00 00 Electrical General Requirements
26 01 26 Testing of Electrical Systems
26 05 00 Basic Electrical Materials & Methods
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 29 Hangers and Support for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 05 43 Underground Ducts and Raceways for Electrical Systems
26 05 53 Identification for Electrical Systems
26 05 73 Overcurrent Protective Device Coordination Study
26 09 13 Electrical Power Monitoring
26 09 23 Lighting Control Devices
26 22 16 Low-Voltage Distribution Transformers
26 24 13 Switchboards
26 24 16 Panelboards
26 27 13 Electrical Power Monitoring
26 27 16 Electrical Cabinets and Enclosures
26 27 26 Wiring Devices
26 28 16 Enclosed Switches and Circuit Breakers
26 31 00 Photovoltaic System Specifications
26 33 00 Central Battery Equipment
26 33 45 Electric Vehicle Charging Stations
26 50 00 Interior Lighting
26 56 00 Exterior Lighting

DIVISION 27 - COMMUNICATIONS
27 05 00 Common Work Results for Communications
27 05 26 Grounding and Bonding for Communications Systems
27 05 28 Pathways for Communications Systems
27 11 00 Communications Equipment Room Fittings
27 13 00 Communications Backbone Cabling
27 15 00 Communications Horizontal Cabling

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security
28 13 00 Access Controls
28 23 00 Video Surveillance
28 31 13 Fire Alarm Systems

DIVISION 31 - EARTHWORK
31 23 00 Excavation and FIll
31 23 19 Dewatering
31 23 33 Trenching and Backfilling
31 23 34 Pavement Cutting and Excavation
31 25 00 Erosion and Sedimentation Controls

DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 Cold Milling Asphalt Paving
32 01 90 Operations and Maintenance of Planting
32 12 16 Asphalt Paving
32 13 13 Concrete Paving
32 13 43 Pervious Concrete Paving and Pavement Base
32 14 13 Unit Pavement
32 17 23 Pavement Markings
32 17 26 Tactile Warning Surfacing
32 17 33 Detectable Warning Tiles
32 17 53 Adjustment of Frames and Castings
32 18 00 Concrete Flatwork and Sitework
32 84 00 Planting Irrigation
32 91 13 Soil Preparation
32 93 00 Planting

DIVISION 33 - UTILITIES
33 33 00 Sanitary Sewerage Utilities

Please submit bids to us by noon on bid day.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers' Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors' faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder's Exchanges, in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato, Monday through Friday from 7:30 AM to 4:30 PM. Plans and specifications may be emailed upon request or downloaded from the following link:
https://tpcorp.box.com/s/eqluhsua9075u3kfl60gzbscb34qac9u

Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Sharyn Mitchell (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com

How to get in touch


Outreach Coordinator
Sharyn Mitchell

Project Estimator
Lee Jones

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949