Is seeking qualified DBEs
Outreach Coordinator
Estimating Department
Project Estimator
Mark Mahboubi & Rod Barber
Telephone
(707) 585-1221
Fax
(707) 585-1601
Address
246 Ghilotti Ave
Santa Rosa, CA 95407
Project Name
Hwy. 280 in Santa Clara & San Mateo Counties (Replace PCC Slabs, Resurface AC, Place Curb Ramps & Guardrails)
Bid/Contract #
#04-3J3204
Awarding Agency
Department of Transportation (CALTRANS)
Project Location
Los Altos Hills & Menlo Park, Santa Clara & San Mateo County, CA
Bid Date
01/07/2020 at 02:00
Project Details
Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for construction (Replace PCC Slabs, Resurface AC, Place Curb Ramps & Guardrails) on Hwy. 280 in Santa Clara and San Mateo Counties in Los Altos Hills and Menlo Park from Foothill Expressway Undercrossing to 0.5 Mile North of Sand Hill Road Overcrossing (04-SCI, SM-280-11.5/20.6, R0.0/R2.1). Quotes requested include, but are not limited to, the following scopes of work: CONSTRUCTION AREA SIGNS, ROADSIDE SIGNS, SIGNAL & LIGHTING, TRAFFIC CONTROL, MAINTAIN EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFY EXISTING ELECTRICAL SYSTEM, COLD PLANE, GRINDING / GROOVE, GRIND EXISTING CONCRETE PAVEMENT, JOINT SEAL, FABRIC & OILS, ASPHALT PAVING, AC DIKE, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, DRILL AND BOND (DOWEL BAR), INDIVIDUAL SLAB REPLACEMENT (RSC), EROSION CONTROL, CONCRETE CURB & SIDEWALK - MISC., METAL BEAM GUARD RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, STORM DRAIN (UNDERGROUND), STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Engineer's Estimate: $50,000,000 / DBE Goal: 19% / 360 WD / $19,200 per day LD. Submit quotes by Noon on bid date. Contact our estimators for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Mr. Mark Mahboubi and Mr. Rod Barber (707/585-1221 or markm@ghilotti.com / rod@ghilotti.com) are the Estimators for this project and are available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the Department of Transportation via their website at http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html. Plans may also be viewed or purchased through local plan rooms, builder's exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form 'CG-2010-1185' or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
How to get in touch
Outreach Coordinator
Estimating Department
Project Estimator
Mark Mahboubi & Rod Barber
Telephone
(707) 585-1221
Fax
(707) 585-1601
Address
246 Ghilotti Ave
Santa Rosa, CA 95407