DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Erin Clutter

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Const. precast slab replacement, cold plane AC pvmt and place RHMA.

Bid/Contract #
12-0N3204

Awarding Agency
California Dept. of Transportation ("Caltrans)"

Project Location
Anaheim & Yorba Linda, Orange County, CA

Bid Date
10/17/2019 at 02:00

Project Details
FBD VANGUARD CONSTRUCTION, INC. IS REQUESTING QUOTES FROM ALL QUALIFIED DBE AND NON-DBE SUBCONTRACTORS AND SUPPLIERS FOR THE FOLLOWING ITEMS OF WORK INCLUDING BUT NOT LIMITED TO: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY TRAFFIC SCREEN, PREPARE WATER POLLUTION CONTROL PROGRAM, TREATED WOOD WASTE, REMOVE CONCRETE, IMPORTED BORROW, REPLACE BASE, ASPHALTIC EMULSION (FOG SEAL COAT), HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE, TACK COAT, REMOVE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, DOWEL BAR, DRILL AND BOND (DOWEL BAR), SPALL REPAIR (FAST-SETTING CONCRETE), REMOVE CONCRETE PAVEMENT, GRIND EXISTING CONCRETE PAVEMENT, PRE/POST CONSTRUCTION SURVEYS, REMOVE PAVEMENT MARKER, DELINEATOR, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH LAMINATED PANEL SIGN (1"-TYPE B) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED & 0.080"-UNFRAMED & 0.063"-FRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED & 0.080"-UNFRAMED & 0.063"-FRAMED & 0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGNS, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN (MAST-ARM HANGER METHOD), MIDWEST GUARDRAIL SYSTEM, DOUBLE MIDWEST GUARDRAIL SYSTEM, END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, SEVERE-DUTY CRASH CUSHION, REMOVE GUARDRAIL, REMOVE CRASH CUSHION (SAND FILLED), THERMOPLASTIC PAVEMENT MARKING, THERMOPLASTIC TRAFFIC STRIPE, PAINT TRAFFIC STRIPE (2-COAT), REMOVE PAINTED TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE & PAVEMENT MARKING, INDUCTIVE LOOP DETECTOR, MODIFYING EXISTING ELECTRICAL SYSTEM, AND READY MIX CONCRETE

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Documents can also be downloaded from the following website: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=12-0N3204. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Erin Clutter

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550