DBEGoodFaith.com


Thompson Builders Corporation

Is seeking qualified DBEs, MBEs, WBEs, SBEs, LSB



Outreach Coordinator
Sharyn Mitchell

Project Estimator
Lee Jones

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949


Project Name
BART Sewage Pumps Replacement Project

Bid/Contract #
BARTD-54RR-110

Awarding Agency
BART

Project Location
Oakland, Alameda County, CA

Bid Date
10/01/2019 at 02:00

Project Details

ALL POTENTIAL SUBCONTRACTORS
*********************************************************************************
THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers and all DBE, MBE, WBE, SBE, LSB and LBE subcontractors, suppliers & truckers for the following project.

BART Sewage Pumps Replacement Project [BARTD-54RR-110]
Replacement of sewage pumps plus control systems at twenty-four (24) various locations throughout the District.
Owner: BART
Bid Date: 10/1/2019 @ 2:00 PM Estimate: $8M-$9M

Seeking ALL subcontractors/suppliers/truckers and all DBE, MBE, WBE, SBE, LSB and LBE subcontractors/suppliers/truckers. TRADES NEEDED (but not limited to):

DIVISION 02 - EXISTING CONDITIONS
02 41 19 Selective Structure Demolition
02 80 10 Hazardous Materials Abatement
02 80 10 Attachment 1

DIVISION 03 - CONCRETE
03 01 08 Concrete Restoration
03 05 15 Portland Cement Concrete
03 11 00 Concrete Forming
03 15 00 Concrete Accessories
03 20 00 Concrete Reinforcing
03 30 00 Cast-In-Place Concrete
03 35 00 Concrete Finishing
03 53 00 Concrete Topping
03 61 11 Non-Shrink Grout

DIVISION 05 - METALS
05 05 22 Metal Welding
05 50 00 Metal Fabrications

DIVISION 20 - FACILITY SERVICES
20 01 13 Restoration of Facility Services
20 07 13 Plumbing and HVAC Insulation
20 10 13 Common Materials and Methods for Facility Service-Fire Suppression
Plumbing and HVAC
20 20 13 Pipe Sleeves Supports and Anchors for Facility Services
20 30 13 Vibration Isolation and Seismic Control for Facility Services
20 40 13 Identification for Facility Services
20 50 13 Raceways for Facility Services
20 70 26 Common Materials and Methods for Electrical Systems
20 72 25 Factory and Field Testing Requirements
20 80 00 Systems Integration Testing

DIVISION 22 - PLUMBING
22 13 01 Sanitary Sewerage
22 14 01 Storm Drainage
22 14 29 Sump Pumps

DIVISION 26 - ELECTRICAL
26 05 24 Low Voltage Wires and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 70 Electrical Cabinets and Enclosures
26 24 22 Motors Starters and Contactors
26 24 24 Circuit Breakers and Panelboards

DIVISION 33 - UTIILITIES
33 05 16 Utility Structures
33 05 25 Support and Protection of Utilities
33 05 28 Trenching and Backfilling for Utilities

Please submit bids to us by noon on bid day.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers' Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors' faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder's Exchanges, in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato, Monday through Friday from 7:30 AM to 4:30 PM. Plans and specifications may be emailed upon request or downloaded from the following link: https://tpcorp.box.com/s/qacri6kys2x4i3g23r3bhcul1me1whkg

Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Sharyn Mitchell (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com

How to get in touch


Outreach Coordinator
Sharyn Mitchell

Project Estimator
Lee Jones

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949