DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Erin Clutter

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Modify electrical system, reconstruct curb ramps and sidewalks.

Bid/Contract #
04-1G8404

Awarding Agency
California Dept. of Transportation ("Caltrans")

Project Location
Sebastopol, Sonoma County, CA

Bid Date
09/26/2019 at 02:00

Project Details
FBD VANGUARD CONSTRUCTION, INC. IS REQUESTING QUOTES FROM ALL DBE & NON-DBE SUBCONTRACTORS AND SUPPLIERS FOR THE FOLLOWING ITEMS OF WORK INCLUDING BUT NOT LIMITED TO: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMP. DRAINAGE INLET PROTECTION, STREET SWEEPING, TEMP. CONCRETE WASHOUT, TREATED WOOD WASTE, TEMP. HIGH-VISIBILITY FENCE, CLEAR & GRUB, CONCRETE BACKFILL, ROADSIDE CLEARING, WEED GERMINATION, CULTIVATION, SOIL AMENDMENT, RELOCATE IRRIGATION CONTROLLER, PACKET FERTILIZER, SLOW-RELEASE FERTILIZER, PLANT (GROUP A), PLANT ESTABLISHMENT WORK, CONCRETE PAVERS, WOOD MULCH, CHECK & TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, 1" GALVANIZED STEEL PIPE (SUPPLY LINE), 3" GALVANIZED STEEL PIPE, 4" GALVANIZED STEEL PIPE, 1/2" DRIP IRRIGATION TUBING, CERTIFY EXISTING BACKFLOW PREVENTERS, DRIP VALVE ASSEMBLY, RESET TREE WELL GRATE, RESET TRASH RECEPTACLE, WOOD AND METAL BENCH, 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), BALL VALVE, PVC PIPE CONDUIT (SLEEVE), IMPORTED TOPSOIL, CLASS 2 AB, HOT MIX ASPHALT (TYPE A), TACK COAT, REMOVE AC PAVEMENT, STRUCTURAL CONCRETE (DRAINAGE INLET) , 18" ALTERNATIVE PIPE CULVERT, 12" REINFORCED CONCRETE PIPE, GRATED LINE DRAIN, ABANDON CULVERT, REMOVE DRAINAGE FACILITY, REMOVE CULVERT, REMOVE INLET, ADJUST FRAME AND GRATE TO GRADE, READY MIX CONCRETE, PRE/POST CONSTRUCTION SURVEYS, MISC. IRON AND STEEL, REMOVE ROADSIDE SIGN (WOOD POST), REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), ROADSIDE SIGN, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN (MAST-ARM HANGER METHOD), THERMOPLASTIC STRIPING & MARKINGS, AND MODIFYING EXISTING ELECTRICAL SYSTEM.

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Documents can also be downloaded from the following website: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=04-1G8404. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Erin Clutter

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550