DBEGoodFaith.com


Alten Construction, Inc.

Is seeking qualified DBEs, MBEs, WBEs, DVBEs, SBEs



Outreach Coordinator
Karin Romeo

Project Estimator
Erik Andresen

Telephone
(510) 234-4200 Ext. 26

Fax
(510) 234-4221

Address
1141 Marina Way South
Richmond, CA 94804


Project Name
Library / Learning Resources Center Project (Building 100 Replacement)

Bid/Contract #
--

Awarding Agency
Solano Community College District

Project Location
Fairfield, Solano County, CA

Bid Date
09/25/2019 at 02:00

Project Details
SCOPE: Construction of a new approx. 59,252 SF - 2-Story Library/ Learning Resource Center Bldg. Includes demo of the (E) B100 Library bldg. & 5 modular bldgs. & site improvements. Multi-phased & to be completed per the phasing shown on sheet G1.41. All campus pedestrian access shall be maintained & (E) bldgs. shall remain functional during the duration of the project.
PLA Required / 5% Retention / See GCs 00 72 13 & Special GCs 00 73 13 for higher than usual Insurance Requirements / Starts 11-4-19 & Completes 12-15-21 / RFI Due to Owner 9-10-19 by 2PM
Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
It is now State of CA law to provide CSLB license #'s & DIR #'s on sub lists - make sure to have them on your bid scope!
Alten Construction may implement a CCIP (Contractor Controlled Insurance Program) on this or any Project
Subcontractors & Suppliers are required to comply with Alten's standard subcontract(s) which can be found on our website www.altenconstruction.com

TRADES NEEDED (but not limited to): HazMat Abatement; Demo; Earthwork; Utilities; Paving & Surfacing; Planting & Irrigation; Concrete Reinforcement; Vapor Barriers; CIP Concrete; Concrete Floor Finishes; Precast Arch. Concrete; Structural & Misc Steel; Steel Decking; CF Metal Framing; Metal Fab.; Dec. Metal; Finish Carpentry; Arch. Wood Casework; FRP; Waterproofing; Insulation; Sheet Wall Membrane; Air Water Barriers; Misc. Metal Wall Panels; FRP Rainscreen Panels; TPO Membrane; Roofing; Sheet Metal Flashing & Trim; Roof Access.; Firestopping; Joint Sealants; Doors, Frames & Hdwr; Alum. Window Frames; OH Coiling Doors & Grilles; Access Doors; Storefronts; ETFE Skylight Syst.; Glazing; Gypsum Board; Tiling; Acoustical Ceilings; H20 Vapor Emission Ctrl; Resilient Flooring; Tile Carpeting; Wall Coverings; Int. Wall Panel Syst.; Painting; Visual Display Boards; Signage; Toilet Compart's; Wall & Door Protect.; Toilet/Bath/Laundry Access.; Fire Protection Specialties; Metal Lockers; Bird Ctrl.; Window Washing Syst.; Resid. Appliances; Book Depositories & Theft Prot. Equip.; Library Stack Syst.; Stage Curtains; Window Coverings; Clocks; Site Furnishings; Hydraulic Elevators; Fire Sprinklers; Plumbing; HVAC; Electrical; Communications; & Electronic Safety & Security.

Plans & Specifications are available for review and take-off in our office. Email bids@altenconstruction.com to request download access from Procore. In order for bids to be considered, they must be received at our office by mail, phone or fax one (1) hour prior to bid closing time.

PREVAILING WAGE RATES, INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED) & WKLY CERTIFIED PAYROLL RPTS SUBMITTED ON LCP TRACKER ARE REQUIRED. 100% PERFORMANCE & PAYMENT BONDS MAY BE REQUIRED. ALTEN CONSTRUCTION WILL PAY UP TO 1.5% OF BOND PREMIUM

PLEASE RESPOND TO EMAILED PROCORE INVITATION STATING WHETHER OR NOT YOU ARE BIDDING.
TO REQUEST ACCESS TO PROCORE, EMAIL bids@altenconstruction.com OR CALL (510) 234-4200 x47.

ALTEN CONSTRUCTION, INC IS AN EQUAL OPPORTUNITY EMPLOYER

WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS

Subcontractors & Suppliers are required to comply with Alten's standard subcontract(s) which can be found on our website

NOTICE: BY SUBMITTING A BID, BIDDING SUBCONTRACTOR, SUPPLIER OR VENDOR AGREE, WARRANTS AND UNDERSTANDS THAT A) ALTEN IS RELYING ON THAT BID FOR ITS BID TO OWNER, AND THE BID MAY NOT BE WITHDRAWN AFTER BID OPENING; B) THAT BIDDER HAS REVIEWED THE PLANS AND SPECIFICATIONS, AND AS TO ITS SCOPE OF WORK, AGREES TO PERFORM ALL DUTIES INCLUDING INSURANCE AND INDEMNITY OBLIGATIONS, THAT ARE SPECIFIED BY OWNER AS ALTEN'S DUTIES, TO BIDDER'S DUTIES TO ALTEN; AND C) THAT UPON ALTEN'S AWARD OF THE PRIME CONTRACT SUBCONTRACTOR WILL DULY AND TIMELY EXECUTE ALTEN'S FORM SUBCONTRACT AS TO THE BID SCOPE OF WORK IN THE BID.

How to get in touch


Outreach Coordinator
Karin Romeo

Project Estimator
Erik Andresen

Telephone
(510) 234-4200 Ext. 26

Fax
(510) 234-4221

Address
1141 Marina Way South
Richmond, CA 94804