DBEGoodFaith.com


F. D. Thomas, Inc.

Is seeking qualified HUBS HISTORICALLY UNDERUTILIZED BUSINESSES



Outreach Coordinator
Mike Kostenko

Project Estimator
Mike Kostenko

Telephone
(541) 324-4348

Fax
(541) 664-1105

Address
217 Bateman Dr.
Central Point, OR 97502


Project Name
Lake Livingston Dam Spillway Gate Repair and Coating

Bid/Contract #
190912-01

Awarding Agency
Trinity River Authority of Texas

Project Location
Livingston, Polk County, TX

Bid Date
09/10/2019 at 02:00

Project Details
Erect and Remove Temporary Work Platform and Containment
Furnish and Install Temporary Gate Supports
Gate Surface Preparation to a "Near White" Abrasive Blast Condition
Recoat Spillway Gates
Furnish and Install New Gate Side and Bottom Seal Clamp Bars and Fasteners
Furnish and Install New Gate Side and Bottom Seals
Remove and Replace In-Kind Steel Plates
Remove and Replace with Stronger Members
Add New Steel Plate Stiffeners
Cut Out and Replace In-Kind Members
Remove and Replace Cable Hitch Pin Plates
Grind/Gouge Existing Welds and Repair with New Welds
Repair Steel Skinplate (per Engineer direction)
Drilling/Reaming Drain Holes (as directed by Engineer)
Clean and Lubricate Wire Ropes
Perform Field Tests and Commissioning of Gates
Stoplog (including lifting beam) Surface Preparation to a "Near White" Abrasive Blast Condition
Recoat Stoplogs (including lifting beam)
Furnish and Install New Side and Bottom Seal Stoplog Clamp Bars
Furnish and Install New Side and Bottom Stoplog Seals
Fabricate New Stoplogs and Lifting Beam
Sandblast and Re-coat Spillway Gate Hoist drive shafts, Support Beams, Gears, Gear Reducers, and Motors
Sandblast and Re-coat Outlet Tower Hoist, Support Beams, Gears, Gear Reducers, Hydraulic Pump Cabinet, Hydraulic Cylinder Stem, Irrigation Pump brace and Motors
Clean and Lubricate Spillway Gate Hoist Motor Gears
Aluminum Flap Valve Outlet Covers
Concrete Demolition
Repair Mortal Placement
Rehabilitate Hand Rails on Spillway Piers
Demobilization and Remobilization
Standby Time
Compliance with Temporary Construction Emergency Action Plan (TCEAP)
Compliance with Construction Quality Control Inspection Plan (QCIP)

F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies.

Plans and specifications can be viewed at our office or order from


or Call Mike Kostenko at 541-864-1619 for any additional needed project information. F. D. Thomas Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.

https://www.dropbox.com/sh/0kfbwej1btjkye7/AACK1m0dGCadX_LDNYUNA_jVa?dl=0

How to get in touch


Outreach Coordinator
Mike Kostenko

Project Estimator
Mike Kostenko

Telephone
(541) 324-4348

Fax
(541) 664-1105

Address
217 Bateman Dr.
Central Point, OR 97502