DBEGoodFaith.com


Alten Construction, Inc.

Is seeking qualified DVBEs



Outreach Coordinator
Karin Romeo

Project Estimator
Erik Andresen

Telephone
(510) 234-4200 Ext. 26

Fax
(510) 234-4221

Address
1141 Marina Way South
Richmond, CA 94804


Project Name
Clarendon Elementary School Modernization & Classroom Building

Bid/Contract #
11899

Awarding Agency
San Francisco Unified School District

Project Location
San Francisco, San Francisco County, CA

Bid Date
08/13/2019 at 02:00

Project Details
SCOPE: General School Modernization & Reconstruction including ADA Access, Seismic Upgrades & Fire/Life-Safety Upgrades. Construction of a new 14,000 SF bldg. that includes a media center, 7 general ed classrooms, a music classroom, offices, restrooms, & other support areas. Construction of the new classroom bldg. includes soil modification, over excavation & re-compaction, install of site retaining walls, site utilities, paving, landscaping & irrig. Also includes modernization wk within the (E) bldg including hazmat removal, modernization of a new admin. area, art classroom & the kitchen. Work within the (E) bldg. will also include replacement of the boilers, & install of new phone & data cabling along with other misc. utility & site upgrades.

PLA & Prevailing Wage Required / 5% Retention / See General Conditions 007200 Article 11 for Insurance Req's / MEP & FS Subs MUST be Prequalified / See Suppl. Conditions 007300 for Phasing Diagram - LDs - Duration / RFI Due 7/30/19 / 2 Year Warranty

HazMat Abatement; Demo; Earthwork; H20 / Sanitary Sewer / Storm Drainage Utilities; Bioretention Area Drainage; Flexible Paving; Pavement Markings; Tactile Warning Surf.; Playgrnd Surface Tiles; Landscape & Irrig; Fences & Gates; Site Concrete; Rebar; CIP Concrete; Struct. Steel; Steel Deck; CF Metal Framing; Metal Fab & Stairs; Wood & S.S. Casework; FRP & Res. Paneling; Waterproofing; Insulation; Weather Barriers; Vapor Emiss. Ctrl Syst.; Metal Wall & Soffit Panels; Cement Siding; TPO Roofing; SM Flashing & Trim; Roof Hatches; Firestopping; Joint Sealants; Exp. Control; Doors, Frames & Hdwr; Access Doors & Panels; Coiling Counter & OH Doors; Entrances & Storefronts; Auto Door Openers; Glazing; Glazing Film; Fixed Louvers; Gyp Board; Metal Framing.; PC Plaster; Tile; Acoustic Ceilings, Panels & Insul.; Resilient & Resinous Floor; Wall Coverings; Painting; Visual Display Bds; Signage; Toilet Access. & Compart.; Fire Protection; Lockers; Metal Canopies; Misc. Specialties; Stage Curtains; Window Shades; Site Furnishings; Fire Sprinklers; Plumbing; HVAC; Electrical; Communic.; Electronic Safety & Security.

Plans & Specifications are available for review and take-off in our office.
Email bids@altenconstruction.com to request download access from Procore.
In order for bids to be considered, they must be received at our office by mail, phone or fax one (1) hour prior to bid closing time.

Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
It is now State of CA law to provide CSLB license #'s & DIR #'s on sub lists - make sure to have them on your bid scope!
Alten Construction may implement a CCIP (Contractor Controlled Insurance Program) on this or any Project
Subcontractors & Suppliers are required to comply with Alten's standard subcontract(s) which can be found on our website www.altenconstruction.com

PREVAILING WAGE RATES, INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED) & WEEKLY CERTIFIED PAYROLL REPORTS ARE REQUIRED. 100% PERFORMANCE & PAYMENT BONDS MAY BE REQUIRED. ALTEN CONSTRUCTION, INC. WILL PAY UP TO 1.5% OF BOND PREMIUM.
WE ARE AN EQUAL OPPORTUNITY EMPLOYER.
WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS

NOTICE: BY SUBMITTING A BID, BIDDING SUBCONTRACTOR, SUPPLIER OR VENDOR AGREE, WARRANTS AND UNDERSTANDS THAT A) ALTEN IS RELYING ON THAT BID FOR ITS BID TO OWNER, AND THE BID MAY NOT BE WITHDRAWN AFTER BID OPENING; B) THAT BIDDER HAS REVIEWED THE PLANS AND SPECIFICATIONS, AND AS TO ITS SCOPE OF WORK, AGREES TO PERFORM ALL DUTIES INCLUDING INSURANCE AND INDEMNITY OBLIGATIONS, THAT ARE SPECIFIED BY OWNER AS ALTEN'S DUTIES, TO BIDDER'S DUTIES TO ALTEN; AND C) THAT UPON ALTEN'S AWARD OF THE PRIME CONTRACT SUBCONTRACTOR WILL DULY AND TIMELY EXECUTE ALTEN'S FORM SUBCONTRACT AS TO THE BID SCOPE OF WORK IN THE BID.

How to get in touch


Outreach Coordinator
Karin Romeo

Project Estimator
Erik Andresen

Telephone
(510) 234-4200 Ext. 26

Fax
(510) 234-4221

Address
1141 Marina Way South
Richmond, CA 94804