DBEGoodFaith.com


Mercer-Fraser Company

Is seeking qualified DBEs



Outreach Coordinator
Pyper Daniels

Project Estimator
Mark Benzinger

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502


Project Name
UPGRADE WATER DISTRIBUTION AND WASTEWATER SYSTEM

Bid/Contract #
03-4F4304

Awarding Agency
CALTRANS

Project Location
VARIOUS, COLUSA County, CA

Bid Date
06/12/2019 at 02:00

Project Details
LEAD COMPLIANCE PLAN
CONSTRUCTION AREA SIGNS
TRAFFIC CONTROL SYSTEM
TYPE III BARRICADE
PLASTIC TRAFFIC DRUMS
PORTABLE CHANGEABLE MESSAGE SIGN (LS)
JOB SITE MANAGEMENT
PREPARE STORM WATER POLLUTION PREVENTION PLAN
STORM WATER ANNUAL REPORT
MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX)
TEMPORARY COVER
TEMPORARY FIBER ROLL
TEMPORARY REINFORCED SILT FENCE
TEMPORARY CONCRETE WASHOUT
ASBESTOS COMPLIANCE PLAN
CONTRACTOR-SUPPLIED BIOLOGIST (LS)
CLEARING AND GRUBBING (LS)
ROADWAY EXCAVATION
EMBANKMENT
MAINTAIN EXISTING PLANTED AREAS
CHECK AND TEST EXISTING IRRIGATION FACILITIES
OPERATE EXISTING IRRIGATION FACILITIES
BONDED FIBER MATRIX (SQFT)
FIBER ROLLS
CLASS 2 AGGREGATE BASE (CY)
MINOR HOT MIX ASPHALT
REMOVE BASE AND SURFACING
LOCATING EXISTING FACILITIES
DESTROY WELL
WELL DEVELOPMENT
TESTING WELL (LS)
DRILL PILOT HOLE
REAMING WATER WELL
CONDUCTOR CASING
BLANK WELL CASING
WELL SCREEN
WELL INVESTIGATION
WATER WELL EQUIPMENT
WELL DISINFECTION
WATER QUALITY TESTING
MOBILIZATION, DEMOBILIZATION, AND FINAL CLEANUP
CHAIN LINK FENCE (TYPE CL-8, SLATTED)
5' CHAIN LINK GATE (TYPE CL-8, SLATTED)
8' CHAIN LINK GATE (TYPE CL-8, SLATTED)
REMOVE CHAIN LINK FENCE
REMOVE GATE
BUILDING WORK

Mercer Fraser Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Mercer-Fraser Company is a union signatory contractor. Subcontractors must possess a current contractor's license, worker's compensation and insurance coverage during the entire length of the prime contract. 100% Performance and Payment Bonds may be required. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. All Subcontractors will be required to sign our standard Subcontract Agreement. Plans and specifications are available for viewing at our office or you may call Mercer-Fraser Company for further assistance. Please call if assistance is needed in obtaining bonding, insurance, equipment, materials and supplies. Mercer-Fraser Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted.

How to get in touch


Outreach Coordinator
Pyper Daniels

Project Estimator
Mark Benzinger

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502