BMPs, Control of water, Installation of erosion control mat and hydroseeding after completion of chain link fabric installation; Traffic control; Establishment of construction staging area(s); Three (3)-year chain link fabric mesh maintenance and hydroseed establishment period; Potential winterization of all levees and embankments for early termination of work; Cold planning asphalt concrete and installation of new asphalt concrete overlay at certain segments of the existing trail alignment as field-determined by the Engineer; Remove existing asphalt pavement and replace with full depth asphalt pavement at certain locations; Using asphalt emulsion to seal cracks in existing trail as field-determined by the Engineer; Performing slurry seal and striping of the existing trail alignment
Plans & Specs are available to view on Builder's Exchange and at our office. Insurance and Bonding information is available per request. PMK Contractors is an equal opportunity employer.