DBEGoodFaith.com


Mladen Buntich Construction Company Inc

Is seeking qualified ELBE-SLBE



Outreach Coordinator

Telephone
(909) 920-9977

Fax
(909) 920-9905

Address
1500 West 9th Street
Upland, CA 91786


Project Name
Montezuma PPL/Mid-City Pipeline Phase 2 and 70th Alvarado to Saranac-Sidewalk

Bid/Contract #
K-19-1821-DBB-3

Awarding Agency
City of San Diego

Project Location
Mid City, San Diego County, CA

Bid Date
05/07/2019 at 02:00

Project Details
Mladen Buntich Construction Company Inc will be bidding the MONTEZUMA PPL/MID-CITY PIPELINE PH2 AND 70TH-ALVARADO TO SARANAC-SIDEWALK project number K-19-1821-DBB-3 for the City of San Diego project on May 7th 2019. Please have your scope of work to us by Friday May 3rd and Final Pricing by Monday May 6th at 11am.

This project is valued at over 40 million dollars. The duration of work will be 640 working days.

Please direct your attention to the very detailed 134 Line item bid schedule on Planet Bids. To be considered your proposal must be broken down by the associated bid numbers.

Mladen Buntich is looking to subcontract a minimum of 9.1% to SLBEs and 13.2% to ELBEs. There is a plethora of opportunity for various subcontractors, suppliers, and service providers.

We are actively looking for proposals for the following: Inspections, Testing, Archaeological Monitoring, Paleontological Monitoring, Sewage Bypass Pumping, Dewatering, SWPPP Plan Development/Monitoring, Site Photography/Video Recording, Hazardous Waste Haul Off, Clearing, Grubbing, Tree Removal, Soil Removal, Adjusting Manholes to Grade, Survey, Traffic Loop Installation, Cold Milling, Asphalt Supply, Asphalt Placement, Geotextile Fabrics, Crack Sealing, Cub/Gutter/Sidewalk/Cross Gutters/Ramps/Median Concrete/Stamped Concrete, Structures, Concrete Grouting, Aggregate Deliveries, Concrete Delivery, Pipes/Valves/Fittings, Striping, Traffic Control, Electrical Work, Landscaping/Irrigation, Gravity Retaining Walls and Fencing.


MONTEZUMA PPL/MID-CITY PIPELINE PH2
This project will include approximately 4,880 linear feet of new 66" diameter CML&TC steel transmission main and 420 linear feet of 8-inch PVC distribution main. This work will also include utility rerouting, shoring, and micro-tunneling

ALTERNATE A:
If Alternate A is awarded, the contractor shall perform additional Work on the replacement of
8-inch Cast Iron Sewer Line within the City of La Mesa ROW in accordance to the Bid Schedule
and Plans numbered 37333-78-D through 37333-81-D (LM-1 through LM-4) for the
Montezuma PPL/Mid-City Pipeline Ph2 project.

ALTERNATE B:
If Alternate B is awarded, the contractor shall deduct overlay and striping Work within the City
of La Mesa ROW originally shown in the base Bid for Montezuma PPL/Mid-City Pipeline Ph2
in accordance to the Bid Schedule.

70TH-ALVARADO TO SARANAC-SIDEWALK:
This portion of the project proposes to install new concrete sidewalk on the west side of 70th
street between Alvarado Road and Saranac Street. The work is to include installation of new
4' and 5' wide concrete sidewalk, curb and gutter, retaining walls, pedestrian push buttons,
chain link fencing, bike lane striping, traffic and signing, and relocation/adjustment of
pedestrian barricade and signs.


Plans and Specifications can be downloaded directly from the city at no cost https://www.sandiego.gov/cip/bidopps or can be downloaded from our dropbox account below at no cost https://www.dropbox.com/sh/7d45hpea20y55eg/AADNIrpGx1lX_mUVuGZ2uZzqa?dl=0


Assistance is available for SLBE-ELBE Subcontractors in obtaining necessary equipment, supplies, or materials from Mladen Buntich.

Assistance is available for SLBE-ELBE firms in obtaining bonding, lines of credit or insurance from Mladen Buntich.

If you have any questions gaining access to the plans and specifications, please call Chris Whitehead at 909-920-9977 or email at estimating@buntich.com.

How to get in touch


Outreach Coordinator

Telephone
(909) 920-9977

Fax
(909) 920-9905

Address
1500 West 9th Street
Upland, CA 91786