Project Name
SOUTHEAST WATER POLLUTION CONTROL PLANT 042-SEISMIC RETROFIT AND REHABILITATION PROJECT NO. CWWSIPSE08

Bid/Contract #
CONTRACT NO. WW-665

Awarding Agency
City & County of San Francisco / SFPUC

Project Location
San Francisco, CA County, CA

Bid Date
04/11/2019 at 14:00

Project Details
ALL POTENTIAL LBE, San Francisco (Local) Small and Micro-LBE, SUBCONTRACTORS
*********************************************************************************
THOMPSON BUILDERS CORPORATION is requesting bids from subcontractors, suppliers & truckers for the following project.

SOUTHEAST WATER POLLUTION CONTROL PLANT 042-SEISMIC RETROFIT AND REHABILITATION CONTRACT NO. WW-665
PROJECT NO. CWWSIPSE08

Owner: City and County of San Francisco
Bid Date: 3/28/2019 @ 2:00 PM Estimate: $15,000,000-$16,000,000

Seeking LBE, San Francisco (Local) Small and Micro-LBE, subcontractors/suppliers/truckers. TRADES NEEDED (but not limited to):

02 21 13 SITE SURVEYS AND SITE PREPARATION
02 41 00 DEMOLITION
02 41 19 SELECTIVE STRUCTURAL DEMOLITION
03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
05 12 00 STRUCTURAL STEEL FRAMING
05 30 00 STEEL DECKING
05 50 00 METAL FABRICATIONS
05 51 19 METAL GRATING STAIRS
05 52 13 PIPE AND TUBE RAILINGS
09 97 72 COATING AND LINING
22 04 00 GENERAL REQUIREMENTS FOR PLUMBING
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING
AND EQUIPMENT
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 00 PLUMBING INSULATION
22 10 00 PLUMBING PIPING
26 04 00 GENERAL REQUIREMENTS FOR ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 33.26 PGRS CONDUIT AND SYSTEM COMPONENTS
26 05 43 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS
26 27 26 WIRING DEVICES




26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 56 00 EXTERIOR LIGHTING
31 11 00 CLEARING AND GRUBBING
31 20 00 EARTH MOVING
31 23 19 DEWATERING
31 50 00 EXCAVATION SUPPORT AND PROTECTION
31 63 00 DRILLED CONCRETE PIERS
32 12 16 ASPHALT PAVING
32 13 13 CONCRETE PAVING
33 30 00 SANITARY SEWERAGE & STORM DRAINAGE UTILITIES
40 05 13 COMMON WORK RESULTS FOR PROCESS PIPING
40 05 13.13 STEEL PROCESS PIPING
40 05 13.19 STAINLESS STEEL PROCESS PIPING
40 05 13.33 BRASS, BRONZE, COPPER AND COPPER ALLOYS PROCESS PIPING
40 05 13.53 DUCTILE, MALLEABLE, AND CAST IRON ALLOYS PROCESS PIPING
40 05 13.73 PLASTIC PROCESS PIPING
40 05 23 PROCESS VALVES
40 90 00 INSTRUMENTATION AND CONTROL FOR PROCESS SYSTEMS
40 95 13 PROCESS CONTROL PANELS AND HARDWARE
46 24 23 INCLINE GRINDERS

Please submit bids to us by noon on bid day.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers' Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors' faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder's Exchanges, in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato, Monday through Friday from 7:30 AM to 4:30 PM. Plans and specifications may be emailed upon request or downloaded from the following link:
https://tpcorp.box.com/s/9pkn1qpufwvpm9ke83gpp7cm9aewauzq


Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Sharyn Mitchell (415) 456-8972 FAX: (415) 459-0665
EMAIL: sharynm@tbcorp.com

How to get in touch


Outreach Coordinator
Sharyn Mitchell

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Boulevard, Building A
Novato, CA 94949