DBEGoodFaith.com


Bridgeway Civil Constructors, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
4950 Allison Parkway, Suite A
Vacaville, CA 95688


Project Name
Construction of State Highway in Sonoma County Near Cotati East of Hessel Road to East of Bartleson Road

Bid/Contract #
04-4G3804

Awarding Agency
State of California, Department of Transportation

Project Location
Cotati, Sonoma County, CA

Bid Date
01/31/2019 at 14:00

Project Details
Bridgeway Civil Constructors, Inc. (Bridgeway) is preparing to bid the project below as a Prime Contractor:

PROJECT: CONSTRUCTION ON STATE HIGHWAY IN SONOMA COUNTY NEAR COTATI EAST OF HESSEL ROAD. DBE GOAL IS 15%

OWNER: STATE OF CALIFORNIA, DEPARTMENT OF TRANPORTATION-CONTRACT 04-4G3804

BID DATE: January 17TH 2019, AT 2:00 P. M. ESTIMATOR: GABE FARNCROFT

Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY ALTERNATIVE CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY DEWATERING AND NON-STORM WATERDISCHARGE CONTROL SYSTEM, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, REMOVE CONCRETE (SQYD), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, COMPACTION GROUTING, STRUCTURE EXCAVATION (TYPE D), STRUCTURE EXCAVATION (RETAINING WALL), STRUCTURE BACKFILL (BRIDGE), STRUCTURE BACKFILL (RETAINING WALL), PERVIOUS BACKFILL MATERIAL (RETAINING WALL), DITCH EXCAVATION, ROADSIDE CLEARING, SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP H), PLANT (GROUP I), PLANT (GROUP A), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, 2" WYE STRAINER ASSEMBLY, RISER SPRINKLER ASSEMBLY, CAM COUPLER ASSEMBLY, 2" GATE VALVE, 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), BALL VALVE, IMPORTED BIOFILTRATION SOIL, ROLLED EROSION CONTROL PRODUCT (NETTING), ROLLED EROSION CONTROL PRODUCT (BLANKET), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE SUBBASE, CLASS 2 AGGREGATE BASE (CY), PRIME COAT, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, 24" CAST-IN-DRILLED-HOLE CONCRETE PILING, STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE, RETAINING WALL, STRUCTURAL CONCRETE, DRAINAGE INLET, FURNISH PRECAST PRESTRESSED CONCRETE SLAB (TYPE SIII), FURNISH PRECAST PRESTRESSED CONCRETE SLAB (MODIFIED), ERECT PRECAST PRESTRESSED CONCRETE DECK UNIT, JOINT SEAL (MR 1"), BAR REINFORCING STEEL (BRIDGE), BAR REINFORCING STEEL (RETAINING WALL), 18" ALTERNATIVE PIPE CULVERT, 24" ALTERNATIVE PIPE CULVERT, CONCRETE BACKFILL (PIPE TRENCH), 18" CORRUGATED STEEL PIPE (.109" THICK), 24" CORRUGATED STEEL PIPE (.109" THICK), 21" X 15" CORRUGATED STEEL PIPE ARCH (.109" THICK), CLASS 3 PERMEABLE MATERIAL (BLANKET), ANCHOR ASSEMBLY, GEOMEMBRANE LINER, 18" ALTERNATIVE FLARED END SECTION, REMOVE CULVERT (LF), REMOVE REINFORCED CONCRETE BOX CULVERT (LS),REMOVE HEADWALL, ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MISCELLANEOUS IRON AND STEEL, EMERGENCY VEHICLE DETECTION SYSTEM, STAIN GALVANIZED SURFACES (LS), REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), OBJECT MARKER (TYPE L-1), SPECIAL MARKER, REMOVE ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063") UNFRAMED FOR RETROREFLECTIVE (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080") UNFRAMED FOR RETROREFLECTIVE (TYPE XI, RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN - ONE POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN (MAST-ARM HANGER METHOD), MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CALIFORNIA ST-70 BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, "6" " THERMOPLASTIC TRAFFIC STRIPE (BROKEN 6-1)", REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MODIFYING EXISTING ELECTRICAL SYSTEM, MOBILIZATION.
All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.


Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.

How to get in touch


Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
4950 Allison Parkway, Suite A
Vacaville, CA 95688