Bridgeway Civil Constructors, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
4950 Allison Parkway, Suite A
Vacaville, CA 95688


Project Name
Construction on State Highway in Napa County Near Saint Helena at Conn Creek

Bid/Contract #
04-1G4304

Awarding Agency
State of California, Department of Transportation

Project Location
Saint Helena, Napa County, CA

Bid Date
01/09/2019 at 14:00

Project Details
Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:

LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD(LS), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY FIBER ROLL, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION ROADWAY, STREET SWEEPING, TEMPORARY ACTIVE TREATMENT SYSTEM, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, TEMPORARY CREEK DIVERSION SYSTEM, ASBESTOS COMPLIANCE PLAN, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS), TEMPORARY HIGH-VISIBILITY FENCE, TEMPORARY TIMBER CONSTRUCTION MAT, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS), ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) (SELECTED MATERIAL), ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) (SELECTED MATERIAL) (FINE AGGREGATE), ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) (SELECTED MATERIAL) (NATURAL), ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) (SELECTED MATERIAL) (COBBLES), STRUCTURE EXCAVATION(BRIDGE) (NATURALLY OCCURRING ASBESTOS), STRUCTURE EXCAVATION (TYPE D) (NATURALLY OCCURRING ASBESTOS), STRUCTURE EXCAVATION (GROUND ANCHOR WALL) (TYPE D) (NATURALLY OCCURRING ASBESTOS), STRUCTURE BACKFILL (BRIDGE), STRUCTURE BACKFILL (GROUND ANCHOR WALL), DITCH EXCAVATION (NATURALLY OCCURRING ASBESTOS), IMPORTED BORROW (CY), SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP H), PLANT (GROUP I), PLANT (GROUP A), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, 2" WYE STRAINER ASSEMBLY, 2" GALVANIZED STEEL PIPE (SUPPLY LINE ON BRIDGE), RISER SPRINKLER ASSEMBLY, CAM COUPLER ASSEMBLY, 2" GATE VALVE, 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), BALL VALVE, PLANT TUBE, IMPORTED BIOFILTRATION SOIL, IMPORTED TOPSOIL (CY),,ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST (CY), INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE (CY),LEAN CONCRETE BASE, CRACK TREATMENT, PREPAVING INERTIAL PROFILER, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE (TYPE C), TACK COAT, REMOVE ASPHALT CONCRETE PAVEMENT (SQFT), COLD PLANE ASPHALT CONCRETE PAVEMENT, GROUND ANCHOR (SUBHORIZONTAL), TEMPORARY SOIL NAIL, TEST BORINGS, 30" CAST-IN-DRILLED-HOLE CONCRETE PILING, 60" CAST-IN-DRILLED-HOLE CONCRETE PILING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ), STRUCTURAL CONCRETE, DRAINAGE INLET, STRUCTURE CONCRETE, JUNCTION STRUCTURE, BENT CAP WITH COLUMN MOCK-UP, FURNISH PRECAST CONCRETE ABUTMENT SEGMENT, FURNISH PRECAST CONCRETE PIER CAP SEGMENT, FURNISH PRECAST CONCRETE COLUMN, FURNISH PRECAST PRESTRESSED CONCRETE SLAB (TYPE SIV), ERECT PRECAST CONCRETE ABUTMENT SEGMENT, ERECT PRECAST CONCRETE PIER CAP SEGMENT, ERECT PRECAST CONCRETE COLUMN, ERECT PRECAST PRESTRESSED CONCRETE DECK UNIT, JOINT SEAL (MR 1"), BAR REINFORCING STEEL (BRIDGE), BAR REINFORCING STEEL (RETAINING WALL), HEADED BAR REINFORCEMENT, STRUCTURAL SHOTCRETE,BRIDGE REMOVAL, 18" ALTERNATIVE PIPE CULVERT, 72" REINFORCED CONCRETE PIPE, GEOMEMBRANE, 6" PERFORATED PLASTIC PIPE UNDERDRAIN, GEOCOMPOSITE DRAIN, DRAINAGE INLET MARKER, 36" REINFORCED CONCRETE PIPE RISER, ABANDON CULVERT (LF), REMOVE CULVERT (LF), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MISCELLANEOUS IRON AND STEEL, CHAIN LINK FENCE (TYPE CL-6), 16' CHAIN LINK GATE (TYPE CL-6), REMOVE FENCE, REMOVE GATE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 60MS), CALIFORNIA ST-20S BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, "6"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 8-4)" THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MOBILIZATION

All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.

Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.

How to get in touch


Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
4950 Allison Parkway, Suite A
Vacaville, CA 95688