DBEGoodFaith.com


Skanska USA Civil West California District Inc.

Is seeking qualified DBEs



Outreach Coordinator
Irene Rumbaugh

Project Estimator
Joe Sidor

Telephone
(951) 684-5360

Fax
(951) 788-2449

Address
1995 Agua Mansa Road
Riverside, CA 92509


Project Name
REDLANDS PASSENGER RAIL PROJECT MAINLINE CONSTRUCTION IN SAN BERNARDINO AND REDLANDS

Bid/Contract #
IFB 17-1001705

Awarding Agency
SBCTA

Project Location
San Bernardino, Redlands, San Bernardino County, CA

Bid Date
02/14/2019 at 14:00

Project Details
A Sensitive Security Information (SSI) form must be signed and returned by Email: bids.socal@skanska.com prior to being granted access to the plans and specifications.Once your signed SSI form is returned, you will receive a bid invitation via Building Connected.
Traffic Control Devices, Construction Area Signs, Signage, Striping, Equipment Rental or Lease, Safety Equipment, Surveillance Systems, Minor Concrete, Concrete Ditch, Electrical, Earthwork, Asphalt Paving, Asphalt Milling, Fence, Landscape, Handrail, Mechanical, Plumbing, Canopies, Site Furnishings, Masonry, Painting, Land Survey, Quality Control Testing, SWPPP, BMP Materials, Clear and Grub, Bridge Demolition, Aggregate Materials, Rip Rap, Reinforcing Steel, Ready-mix Concrete, Structural Steel, Precast Girders, Steel Piling, CIDH Piling, Waterproofing, Joint Seal Assembly, Bearing Pads, Cellular Concrete, Ground Improvement (Deep Soil Mix), Metal Decking, Miscellaneous Metals, MSE Wall Panels, Articulated Concrete Block, RCP, CMP, HDPE, Waterline Pipe and related.

.Assistance: Skanska will assist qualified subcontractors, vendors, & suppliers in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. If you are a DBE Company, please provide your certification letter with your proposal. If you are a non-DBE, please indicate all lower-tier participation on your quotation as it will be evaluated with your price. In order to assist DBE subcontractors and suppliers, we will divide total requirements into smaller packages, tasks or quantities & establish delivery & construction schedules which will permit maximum participation when feasible. We will also review breaking out scope packages and adjusting schedules to assist permit maximum participation.Form.rnSubcontracting Requirements: Skanska's insurance requirements are Commercial General Liability (GL): $1M ea. occ., $1M personal injury, $2M products & completed operations agg. & general agg; $1M Auto Liability; $5M Excess/Umbrella and $1M Workers Comp. Endorsements and waivers required are the Additional Insured Endorsement. Primary Wording Endorsement, & a Waiver of Subrogation (GL & WC). Other insurance requirements may be necessary per scope or RFP requirement. Subcontractors may be required to furnish performance & payment bonds in the full amount of their subcontract by an admitted surety & subject to approval by Skanska. Quotations must be valid for the same duration as specified by the Owner for contract award. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. Skanska is signatory to the Operating Engineers, Laborers, Cement Masons, & Carpenters Unions. Subcontractors must provide weekly, one original and one copy of all certified payrolls, including non-performance and fringe benefit statements if required by law or by the Prime Contract. rnrnThis contractor and subcontractor(s) shall abide by the requirements of 41 CFR 60-300.5(a) and 60-741.5(a). These regulations prohibit discrimination against qualified individuals on the basis of protected veteran status or disability, and require affirmative action by covered prime contractors and subcontractors to employ and advance in employment qualified protected veterans and individuals with disabilities.

How to get in touch


Outreach Coordinator
Irene Rumbaugh

Project Estimator
Joe Sidor

Telephone
(951) 684-5360

Fax
(951) 788-2449

Address
1995 Agua Mansa Road
Riverside, CA 92509