Is seeking qualified DBEs
Outreach Coordinator
Verity Penland
Telephone
(707) 443-6371
Fax
(707) 443-0277
Address
P.O. Box 1006
Eureka, CA 95502
Project Name
COLD PLANE AC, HMA, ROADWAY EX, CULVERTS & RETAINING WALLS
Bid/Contract #
03-2F3204
Awarding Agency
CALTRANS
Project Location
EAST OF MARYSVILLE, YUBA County, CA
Bid Date
10/03/2018 at 02:00
Project Details
Mercer-Fraser is currently requesting quotes from all qualified DBE subcontractors and/or suppliers for the following items of work:
1 LEAD COMPLIANCE PLAN
2 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
3 TIME-RELATED OVERHEAD (LS)
4 DEVELOP WATER SUPPLY
5 CONSTRUCTION AREA SIGNS
6 TRAFFIC CONTROL SYSTEM
7 TYPE III BARRICADE
8 TEMPORARY PAVEMENT MARKING (PAINT)
9 TEMPORARY TRAFFIC STRIPE (PAINT)
10 PLASTIC TRAFFIC DRUMS
11 TEMPORARY PAVEMENT MARKER
12 PORTABLE CHANGEABLE MESSAGE SIGN (LS)
13 TEMPORARY RAILING (TYPE K)
14 ALTERNATIVE TEMPORARY CRASH CUSHION
15 JOB SITE MANAGEMENT
16 PREPARE STORM WATER POLLUTION PREVENTION PLAN
17 RAIN EVENT ACTION PLAN
18 STORM WATER SAMPLING AND ANALYSIS DAY
19 STORM WATER ANNUAL REPORT
20 TEMPORARY EROSION CONTROL BLANKET
21 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
22 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX)
23 TEMPORARY COVER
24 TEMPORARY CHECK DAM
25 TEMPORARY DRAINAGE INLET PROTECTION
26 TEMPORARY FIBER ROLL
27 TEMPORARY SILT FENCE
28 TEMPORARY CONSTRUCTION ENTRANCE
29 STREET SWEEPING
30 TEMPORARY CONCRETE WASHOUT
31 WATER QUALITY SAMPLING AND ANALYSIS DAY
32 WATER QUALITY ANNUAL REPORT
33 TEMPORARY CREEK DIVERSION SYSTEM
34 CONTRACTOR-SUPPLIED BIOLOGIST (DAY)
35 CLEARING AND GRUBBING (LS)
36 ROADWAY EXCAVATION
37(F) STRUCTURE EXCAVATION (RETAINING WALL) (TYPE D)
38(F) STRUCTURE BACKFILL (RETAINING WALL)
39 ROADSIDE CLEARING
40 MOVE-IN/MOVE-OUT (EROSION CONTROL)
41 BONDED FIBER MATRIX (SQFT)
42 ROLLED EROSION CONTROL PRODUCT (BLANKET)
43 PERMANENT EROSION CONTROL ESTABLISHMENT WORK
44 CLASS 2 AGGREGATE BASE (CY)
45 PREPAVING INERTIAL PROFILER
46 HOT MIX ASPHALT (TYPE A)
47 RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
48 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE)
49 ASPHALT BINDER (GEOSYNTHETIC PAVEMENT INTERLAYER)
50 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING FABRIC)
51 DATA CORE
52 TACK COAT
53 COLD PLANE ASPHALT CONCRETE PAVEMENT
54(F) STRUCTURAL CONCRETE, RETAINING WALL
55(F) STRUCTURAL CONCRETE, BOX CULVERT
56(F) STRUCTURAL CONCRETE, HEADWALL
57(F) STRUCTURAL CONCRETE, DRAINAGE INLET
58(F) MINOR CONCRETE (MINOR STRUCTURE)
59(F) BAR REINFORCING STEEL (RETAINING WALL)
60(F) BAR REINFORCING STEEL (BOX CULVERT)
61 18" ALTERNATIVE PIPE CULVERT
62 24" ALTERNATIVE PIPE CULVERT
63 36" ALTERNATIVE PIPE CULVERT
64(F) CONCRETE BACKFILL (PIPE TRENCH)
65 42" REINFORCED CONCRETE PIPE
66 48" REINFORCED CONCRETE PIPE
67 60" REINFORCED CONCRETE PIPE
68 18" ALTERNATIVE FLARED END SECTION
69 24" ALTERNATIVE FLARED END SECTION
70 36" ALTERNATIVE FLARED END SECTION
71 REMOVE CULVERT (LF)
72 REMOVE INLET
73 REMOVE HEADWALL
74 REMOVE WINGWALL
75 REMOVE FLARED END SECTION (EA)
76 ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY)
77 ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY)
78 ROCK SLOPE PROTECTION FABRIC (CLASS 8)
79 MINOR CONCRETE (GUTTER) (LF)
80(F) MISCELLANEOUS IRON AND STEEL
81 RELOCATE MAILBOX
82 REMOVE FENCE
83 REMOVE GATE
84 RESET GATE
85 DELINEATOR (CLASS 1)
86 TEMPORARY DELINEATOR (CLASS 1)
87 PAVEMENT MARKER (RETROREFLECTIVE)
88 MILEPOST MARKER
89 MARKER (CULVERT)
90 REMOVE ROADSIDE SIGN
91 RESET ROADSIDE SIGN
92 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED)
93 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI)
94 RETROREFLECTIVE SHEETING (TYPE XI)
95 ROADSIDE SIGN - ONE POST
96(F) CHAIN LINK RAILING (MODIFIED)
97(F) CABLE RAILING
98 THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY)
99 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3)
100 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12)
101 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY)
102 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY)
103 REMOVE PAINTED TRAFFIC STRIPE
104 REMOVE PAINTED PAVEMENT MARKING
105 REMOVE THERMOPLASTIC TRAFFIC STRIPE
106 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT)
107 PORTABLE TEMPORARY SIGNAL SYSTEM
108 MOBILIZATION
Mercer Fraser Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Mercer-Fraser Company is a union signatory contractor. Subcontractors must possess a current contractor's license, worker's compensation and insurance coverage during the entire length of the prime contract. 100% Performance and Payment Bonds may be required. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. All Subcontractors will be required to sign our standard Subcontract Agreement. Plans and specifications are available for viewing at our office or you may call Mercer-Fraser Company for further assistance. Please call if assistance is needed in obtaining bonding, insurance, equipment, materials and supplies. Mercer-Fraser Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted.
How to get in touch
Outreach Coordinator
Verity Penland
Telephone
(707) 443-6371
Fax
(707) 443-0277
Address
P.O. Box 1006
Eureka, CA 95502