Is seeking qualified DBEs
Outreach Coordinator
Project Estimator
Jerry Middleton/Aaron Brim
Telephone
(209) 333-1116
Fax
(209) 333-8597
Address
300 W. Pine Street
Lodi, CA 95240
Project Name
Pond D Improvements Project
Bid/Contract #
0277-1400
Awarding Agency
San Andreas Sanitary District
Project Location
San Andreas, Calaveras County, CA
Bid Date
07/27/2018 at 14:00
Project Details
Requesting Bids and Quotes for the Following
Subs/Services: Survey/Construction Staking, Trucking, Erosion Control-Hydroseeding, Fiber Roll Silt Fence, Project Signs, Structural Concrete-Headwalls, Distribution Box, Concrete Lined Ditch.
Materials: Galvanized Steel Grating, Slide Gates, Corrugated Metal Pipe (12",24"), Concrete, RCP Class V (18"), CMP Downdrain Anchor Assemblies.
Scope of Work: Construction of a new drainage diversion ditch including the installation of two parallel concrete pipes and headwalls, concrete vault, a corrugated steel pipe downdrain, energy dissipater, and riprap. Also includes site preparation, grading, trenching, erosion control and cleanup.
Ford is signatory to Operating Engineers Local 3 and Northern California District Council of Laborers unions. Subcontractors must possess a current contractor's license, workers' compensation, insurance coverage and be registered with the DIR during the entire length of the prime contract. 100% Performance and Payment Bonds from an approved Surety may be required. Conditions or exceptions in Subcontractors' quote are expressly rejected unless accepted in writing. Subcontractors will be required to sign a Ford Standard Subcontractor Agreement. Suppliers will be required to sign a Ford Purchase Order. These forms of agreements are available for review at our office. Plans and specifications are available for viewing at Ford's office or you may call Ford for further assistance. Subcontractor and Supplier quotes are required 24 hours prior to the bid date to enable complete evaluation. Assistance in obtaining bonding, insurance, equipment, materials and supplies is available to all who inquire. Ford intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted
How to get in touch
Outreach Coordinator
Project Estimator
Jerry Middleton/Aaron Brim
Telephone
(209) 333-1116
Fax
(209) 333-8597
Address
300 W. Pine Street
Lodi, CA 95240