DBEGoodFaith.com


Tutor Perini Corporation

Is seeking qualified MBEs, WBEs



Outreach Coordinator
Christine Busey

Project Estimator
Steve Markowski

Telephone
(914) 739-1908

Fax
(914) 739-5787

Address
1000 Main Street
New Rochelle, NY 10801


Project Name
Replacement of Roadway Deck in Suspended Spans at the Throgs Neck Bridge

Bid/Contract #
TN-49

Awarding Agency
MTA-TBTA

Project Location
Queens, Queens County, NY

Bid Date
09/18/2018 at 02:00

Project Details
Invitation to Bid for M/WBE & SDVOB Firms


Tutor Perini Corporation, an EEO Employer, is currently soliciting cost proposals from Qualified and Certified M/WBE & SDVOB subcontractors / vendors / service providers, for TN - 49 Replacement of Roadway Deck in Suspended Spans at the Throgs Neck Bridge PROJECT IN THE BOROUGHS OF QUEENS. Client: The MTA-TBTA. Bid Date: August 18, 2018. ALL QUOTATIONS ARE DUE BY COB FRIDAY August 14, 2018. For further information concerning Subcontracting and/or Purchasing opportunities and to register as a subcontractor / vendor please respond to solicitations@tutorperini.com or contact Jackie Cotto (914) 739-1908. Come and join our Team!

The Work to be performed under this Contract may briefly be described as follows: replacement of existing concrete-filled grid deck with orthotropic steel deck within the suspended spans at the Throgs Neck Bridge (TNB); installation of new median and side barriers throughout the TNB suspended spans; installation of new fire standpipes between the TNB Bronx Abutment and the Queens Anchorage; installation of new roadway lighting within the TNB suspended spans and Queens Approach; removal and replacement of four (4) suspender ropes; steel repairs, strengthening and painting of the TNB main trusses and floor trusses and other associated work.

The scope of work includes, but shall not be limited to, the following general items;

1. Replacement of the existing concrete filled steel grid deck and stringers with a new orthotropic deck system with waterproofing membrane and Rosphalt overlay in the suspended spans through staged construction including new concrete median and steel fascia barriers, elimination of the existing safety walks, and the installation of new modular joints at the towers and anchorages.
2. Replacement of the existing reinforced concrete deck at the anchorages and towers, including new waterproofing membrane and Rosphalt overlay.
3. Strengthening of the Stiffening Trusses and Floorbeam Trusses
4. Construction of a new drainage system on the suspended spans and a new roadway lighting system on the suspended spans and Queens Approach.
5. Replacement of existing overhead signs and sign structures throughout the Bridge.
6. Construction of a new fire standpipe system from the Bronx Approach to the Queens Anchorage.
7. Replacement of the existing low voltage and communications conduits and provide new supports for the conduits in the suspended spans.
8. Suspender rope replacement.
9. Opening of Main Cable for inspection
10. Maintenance painting of suspended spans steel structures including areas affected during construction

How to get in touch


Outreach Coordinator
Christine Busey

Project Estimator
Steve Markowski

Telephone
(914) 739-1908

Fax
(914) 739-5787

Address
1000 Main Street
New Rochelle, NY 10801