DBEGoodFaith.com


Thompson Builders Corporation

Is seeking qualified DVBEs



Outreach Coordinator
Dalia Nieto

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949


Project Name
Modernization and New Construction, Measure H Project at River Charter Elementary School

Bid/Contract #
SPC 26.15-17

Awarding Agency
Napa Valley Unified School District

Project Location
Napa, Napa County, CA

Bid Date
06/05/2018 at 02:00

Project Details
SCOPE: Modernization and New Construction ESTIMATE: $23,000,000
GOAL: 3% DVBE
Seeking DVBE subcontractors/suppliers/truckers. Trades needed (but not limited to): Division 02 - Existing Conditions (Building Demolition; Minor Demolition for Remodeling) Division 03 - Concrete (Concrete Forming and Accessories; Concrete Reinforcing; Cast-In-Place Concrete; Concrete Floor Finishing) Division 05 - Metals (Structural Steel Framing; Architecturally Exposed Structural Steel; Metal Decking; Metal Fabrications; Access Ladders; Pipe and Tube Railings; Stair Nosings)Division 06 - Rough Carpentry; Wood I-Joists; Glued Laminated Construction; Finish Carpentry; Custom Cabinets; Wood Veneer Faced Paneling; Fiberglass Reinforced Paneling) Division 07 - Bituminous Dampproofing; Board And Batt [Building] Insulation; Roof Insulation; Weather Barriers; Water Vapor Emission Control; Metal Roof Panels; Fiber Cement Siding; Modified Bitument Roofing; Sheet Metal Flashing and Trim; Roof Specialties; Roof Accessories; Firestopping; Joint Sealants) Division 08 - Openings (Hollow Metal Doors and Frames; Flush Wood Doors; Access Doors and Panels; Overhead Coiling Doors; Aluminum Entrances and Storefronts; Aluminum Windows; Tubular Skylights; Door Hardware; Glazing; Mirrors; Louvers) Division 09 - Concrete Floor Preparation; Concrete Floor Moisture Content and PH Testing; Gypsum Board Assemblies; Acrylic Modified Portland Cement Plaster; Tiling; Suspended Acoustical Ceilings; Cushioned Wood Flooring Assemblies; Resilient Flooring; Fluid-Applied Flooring; Tile Carpeting; Wall Covering; Acoustical Panels; Exterior Painting; Interior Painting) Division 10 - Specialties (Recycled PVC Safety Flooring; Visual Display Boards; Signage; Reinforced Composite Toilet Compartments; Toilet Accessories; Fire Protection Specialties; Lockers; Flagpoles)Division 11 - Equipment (Food Service Equipment; Stage Draperies & Tracks; Gymnasium Equipment) Division 12 - Furnishings (Window Shade Systems; Display Casework; Modular Instrument Storage; Countertops; Telescoping Bleechers; Site Furnishings) Division 14 - Conveying Equipment (Wheelchair Lifts) Division 21 - Fire Suppression (Fire Protection) Division 22 - Plumbing (Plumbing) Division 23 - HVAC (Heating, Ventilating, Air Conditioning; General Mechanical; Testing Adjusting and Balancing For HVAC; Energy Management System for HVAC) Division 26 - Electrical (Testing; Service and Distribution System; Basic Electrical Materials & Methods; Lighting; Site Lighting; Low Voltage Lighting Control System) Division 27 - Communications (Voice and Data Communication System; Classroom Audio-Video System; Public Address and Clock System; Assisted Listening System) Division 28 - Electronic Safety and Security (Fire Alarm System) Division 31 - Earthwork (Clearing and Grubbing; Earthwork General Provisions; Site Preparation; Excavation; Lime Treatment; Trenching, Backfill and Compaction) Division 32 - Exterior Improvements (Concrete Work; Permeable Interlocking Concrete Pavement; Track Surfacing; Pavement Markings and Markers, Hot Mix Asphalt; Chain Link Fences & Gates; Sliding Gates; Curb, Gutter and Sidewalks; Irrigation Systems; Landscape Planting ) Division 33 - Utilities (Sanitary Sewer System; Storm Drainage; Water Distribution System; Valves, Hydrants and Appurtenances; Clean Drain Rock)

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request. Plans and specs may be downloaded from the following link: rnhttps://tpcorp.box.com/s/byhtnzbg0oymfyb4f03b47j811x3jxgornrn*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

How to get in touch


Outreach Coordinator
Dalia Nieto

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949