Project Name
THIRD STREET BRIDGE REHABILITATION PROJECT

Bid/Contract #
Contract No. 1000007012

Awarding Agency
San Francisco Public Works

Project Location
San Francisco, San Francisco County, CA

Bid Date
05/16/2018 at 02:30

Project Details
TRAFFIC ROUTING WORK; QUALIFIED BIOLOGIST; SILT AND TURBIDITY CURTAINS; JOB SITE MANAGEMENT; PROGRESS SCHEDULE (CRITICAL PATH METHOD); RESIDENT ENGINEER'S OFFICE; DRILL AND BOND DOWEL (CHEMICAL ADHESIVE); JOINT SEAL (MR 1"); REPLACE JOINT ARMOR (PIER 2); CEMENTITIOUS GROUT; BAR REINFORCING STEEL (EPOXY COATED); STRINGER DIAPHRAGM; REMOVE DECK SYSTEM; INSTALL SILL BEAM & OPEN STEEL DECK GRATE SYSTEM; PERFORATED STEEL DECK PLATES; PLASTIC LUMBER (UNREINFORCED & REINFORCED); TIMBER DECKING; FLOOR BEAM REPAIR (FLOOR BEAMS 16 &12 , BOTTOM FLANGE REPAIR,TIE PLATE); FASTENER REPAIR ‐ (ADD BOLT, REPLACE BOLT); DRILL WEEP HOLE ‐ 3/4 INCH & 2 INCH DIAMETER; SWAY BRACE REPAIR; BOTTOM LATERAL REPAIR; HANGER ROD AND SLEEVE REPLACEMENT; STRINGER REPAIR ‐ (TOP FLANGE REPAIR, BATTEN PLATE REPAIR); TRUSS MEMBER REPAIR (BOTTOM CHORD @ FB 0, IMPACT DAMAGE, REPLACE LACING, GUSSET PLATE); TRUSS LATERAL REPAIR; PACK RUST REPAIR - (TYPE 2, TYPE 3, TYPE 4); STIFFEN GUSSET PLATE; STAIR, WALKWAY REPAIR; LADDER SAFETY CAGE; END LOCK OPENING RETROFIT; NON‐SKID SURFACE FINISH; REMOVE AND RECONSTRUCT FENDER SYSTEM(PORTION); INJECT CRACK (EPOXY); FIBERGLASS SLEEVE (20", 22", 24"DIAMETER, COLUMN AND BEAM); PEDESTRIAN GATE SUPPORT& RAILING MODIFICATION; ADDITIONAL BALLAST AND BRIDGE BALANCING; LIGHTWEIGHT CONCRETE (CURB AND MEDIAN); REPLACE HANDRAIL; ELECTRICAL, MECHANICAL REPAIR & UPGRADE; BRIDGE TRAFFIC AND PEDESTRIAN GATES.

F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies.
F. D. Thomas Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.

Plans and specs for this project are available for your review either at our office or online:
https://www.dropbox.com/sh/lwgrvmewj50oqtz/AAAF2AzOrgy8S9_E3TRogF2Fa?dl=0

How to get in touch


Outreach Coordinator
Mike Kostenko

Telephone
(541) 864-1619

Fax
(541) 864-1631

Address
217 Bateman Dr.
Central Point, OR 97502